operation and calibration of refractometer

 

operation and calibration of refractometer

1.0 Purpose
1.1 To describe a procedure for operation and calibration of Refractometer.

2.0 Scope
2.1 This standard operating procedure is applicable for operation and calibration

of Refractometer in Quality Control laboratory at  ABC Pvt. Ltd.

3.0 Responsibility
Officer QC/ Executive QC Preparation of SOP and follow the procedure as per SOP
Assistant Manager Reviewing and Training of SOP
Manager QC Implementation of SOP
4.0 Accountability
4.1 Manager Quality Control is accountable for implementation and compliance with SOP.

5.0 Procedure
5.1 Operation
5.1.1 Ensure that the instrument is clean.
5.1.2 Insert the plug of illumination assembly box and attach the illumination tubes to the

inlet provided on the left side of the instrument and to the adjustable clamp beneath the prism box using the small pin.
5.1.3 Turn on the illumination using the switch provided on the illumination assembly box.
5.1.4 To check the liquid samples, simply open the prism box now place few drops of the samples on the bower prism.
5.1.5 Now looking in the eyepiece focus accordingly simply by rotating the eyepiece in either direction.
5.1.6 After the sample is placed in the prism box. The refraction creates a shade in the crosswire box.

The shade is to be brought in the center of the cross-wine (where they intersect) using the scales

know located on the left side of the instrument.
5.1.7 Rotating the dispersion scale located on the right side in either direction, eliminate the

colour bands visible on the edge of the shade to attain sharp borderline.
5.1.8 For examining plastic bodies such as resin detach the lower prism & soften the material by

heat and smear a little on the exposed surface of the upper prism. To examine crystals or

glasses a specimen must be prepared similar to the standard list piece.

5.2 Calibration (Frequency: after 6 Months)
5.2.1 Ensure that all the parts including eye lens and prisms are clean before operation.
5.2.2 Turn on the illumination using the switch provided on the illumination assembly box.
5.2.3 Use thermometer and water jacket with tubes to make the constant temperature of sample compartment.
5.2.4 Open the prism lock and place few drops of distilled water at the temperature 25°C.
5.2.5 Allow the distilled water to smear on the lower prism surface quickly close the prism lock.
5.2.6 Adjust the eyepiece cross wire with a knob by rotating it in a clock wise or anti-clock wise

direction so that the sharp demarcation line passes through its centre.
5.2.7 Sharp demarcation is produced in the form of a circle having half-light and half dark portion.
5.2.8 Fine adjustment can be done by a knob provided just above the prism.
5.2.9 Note down the reading from the scale with the help of the magnified lens of the instrument.
5.2.10 Clean the instrument and repeat the procedure for carbon tetra chloride and Toluene measure at 20º±0.5° C.
5.2.11 Document the activity in Calibration Record Format (Annexure I).
5.2.12 Report any discrepancy observed during calibration of instrument to Quality Control

Manager or his designee for corrective and preventive action.

5.3 Cleaning
5.3.1 Clean the instrument after listing sample applies a small amount of acetone to cotton swap

and gently clean the prism. Use dry cotton or tissue paper wipe the prism make sure not to scratch the prism.
5.3.2 After use the instrument Clean and keep under cover.
5.4 Precaution
5.4.1 Handle the instrument properly.
5.4.2 Temperature should be carefully adjusted and maintained since refractive

index varies significantly with temperature.
5.4.3 Quality Control Manager or his designee informs the defect to Maintenance Department service

engineer to rectify the defect. Affix ‘Under Maintenance’ label on the instrument.

6.0 Reference
In House Specification

7.0 Attachments
Annexure I : Refractometer Calibration Format

8.0 Distribution
Distribution of the controlled copy to concerned departments.
Additional copies may be issued for specific purpose.

9.0 ABBREVIATIONS
QA : Quality Assurance
QC : Quality Control
SOP : Standard Operating Procedure

10.0 REVISION HISTORY

Revision No. Supersedes Effective Date Details of reason
01 Nil New SOP

 

Operating Procedure of Centrifuge

sop for preparation and storage of reagent solution

sop for Calibration and Maintenance of Laboratory Instruments and Equipment

Disposal of Residual Sample or Left Over Material

sop for for Laboratory Incident

standard operating procedure temperature monitoring

sop for drying of silica gel

sop for operation of infrared moisture balance

sop for preparation of mobile phase

sop for treated RO water

sop for Preparation and Issuance of Analysis protocol standard

sop of placebo and impurity stock solutions

sop for disposal of residual sample  

sop for handling of pharmacopoeial changes

sop for procedure for operation of ultrasonic cleaner

difference between UPLC and HPLC

sop for for Emergency Eyewash and Shower

sop for operation and calibration of total organic carbon analyzers

sop for operation of cobb tester

sop for Operation and calibration of atomic absorption spectrophotometer

sop for Operation and calibration of gas liquid chromatograph

sop for operation of humidity oven

sop for operation and calibration of serological water bath

sop for monitoring of drain trap

sop for destruction of analytical samples after testing and control samples

sop for destruction of used chemicals

Sop for Operation of suction pump

sop for Operation and calibration uv cabinet

sop for Operation and calibration of bulk density apparatus

sop for operation and calibration of shore hardness tester

sop for operation of rub proofness tester

sop for monitoring of purified water

sop for Retesting of packaging materials

sop for Retesting and resampling of raw materials

sop for Control of issuance of record of analysis green sheets

sop for Control of computer passwords

sop for sampling of packaging materials PM

Operation and Calibration Procedure for pH Meter

Calibration of Melting Point Apparatus

Procedure For HPLC column washing procedure

Procedure For Retest Period of Raw Material

Procedure For Training Programme For Quality Control Personnel

Standard Operating Procedure is to provide guidelines for Preparation

Procedure For Analysis of Water rinsing

Procedure For Calibration of Glassware

Procedure For Procurement and storage of reference standards

Procedure For Preparation of buffer solution

safety guidelines for laboratory

responsibilities of quality control and microbiological department

responsibilities of quality control and microbiological department

handling of corrosive hazardous and flammable chemical

cleaning of glassware

calibration of volumetric glassware

operation and cleaning of water bath

sampling of raw materials

testing and approval rejection of bulk finish and packed drug products

procedure for preparation of general test procedures and standard test procedures

disposal of samples chemicals glassware columns

hplc column performance evaluation storage and destruction

operation and calibration of uv cabinet

operation and calibration of refractometer

Leave a Comment

error: Content is protected !!