sop for Calibration of Dosing Pumps

  sop for Calibration of Dosing Pumps   1.0 OBJECTIVE : 1.1 To lay down a procedure for Calibration of Dosing Pumps. 2.0. SCOPE : 2.1 This procedure is applicable to Calibration of Dosing Pumps Water plant Chemical dosing Pumps at Pharma Dekho . 3.0. RESPONSIBILITY : 3.1 Operator Engineering Department shall be responsible for … Read more

sop for Colour Coding of Pipe line

  sop for Colour Coding of Pipe line   1.0 OBJECTIVE : 1.1 To lay down a procedure for Colour Coding of Pipe line. 2.0. SCOPE : 2.1 This procedure is applicable for Colour Coding of Pipe line. 3.0. RESPONSIBILITY : 3.1 Operator Engineering Department shall be responsible for Colour Coding of Pipe line. 3.2 … Read more

Programmable Logic Controller system operation security and its services

  Programmable Logic Controller system operation security and its services   1.0 OBJECTIVE : 1.1 To lay down a procedure for carrying out Programmable Logic Controller operation, security and its services. 2.0. SCOPE : 2.1 This procedure covers the all system’s Programmable Logic Controller’s operation, security and its services 3.0. RESPONSIBILITY : 3.1 Engineering and … Read more

sop for Engineering Spares Parts Inventory Control

  sop for Engineering Spares Parts Inventory Control   1.0 OBJECTIVE : 1.1 To lay down a procedure for Receiving of Stockable engineering inventory material. 2.0. SCOPE : 2.1 This Procedure is applicable for Receiving of Stockable engineering inventory material at pharma dekho 3.0. RESPONSIBILITY : 3.1 Engineering-Officer 4.0. ACCOUNTABILITY : 4.1 Head of the … Read more

sop for cleaning Integrity and Replacement of process of Water System

  sop for cleaning Integrity and Replacement of process of Water System   1.0 OBJECTIVE : 1.1 To lay down a procedure for cleaning, Integrity and Replacement of process of Water System. 2.0. SCOPE : 2.1 This SOP is applicable to all water system installed at Pharma Dekho. 3.0. RESPONSIBILITY : 3.1 HOD of EM … Read more

sop for Audio Visual Alarms of various systems

    sop for Audio Visual Alarms of various systems   1.0 OBJECTIVE : 1.1 To lay down a procedure for rectification of audio visual alarms of various systems.. 2.0. SCOPE : 2.1 This procedure is applicable to Stability chamber, BOD Incubator, N2, O2 and Granulation/Coating AHU’S situated at Pharma Dekho. 3.0. RESPONSIBILITY : 3.1 … Read more

sop for Operation of Nitrogen Plant

  sop for Operation of Nitrogen Plant   1.0 OBJECTIVE : 1.1 To lay down a procedure for operation of nitrogen gas plant. 2.0. SCOPE : 2.1 This procedure is applicable to Nitrogen gas plant situated at pharma Dekho 3.0. RESPONSIBILITY : 3.1 Operator Engineering Department shall be responsible for operation of nitrogen gas plant … Read more

procedure for Replacement of Brine Solution of Homogenizer Chiller

  procedure for Replacement of Brine Solution of Homogenizer Chiller   1.0 OBJECTIVE : 1.1 To lay down a procedure for Replacement of Brine Solution of Homogenizer Chiller. 2.0. SCOPE : 2.1 This procedure is applicable to replacement of brine solution of homogenizer chiller situated at pharma Dekho 3.0. RESPONSIBILITY : 3.1 Operator shall be … Read more

sop for assigning identification to filters

  sop for assigning identification to filters 1.0 OBJECTIVE : 1.1 To lay down the procedure for the assigning identification to filters. 2.0. SCOPE : 2.1 This procedure is applicable for assigning identification to filters situated at pharma Dekho 3.0. RESPONSIBILITY : 3.1 Officer/Executive of Engineering Department will be responsible for assigning identification to filters … Read more

Replacement of Activated Charcoal and Cartridges Oil Filter of N2 Plant

    Replacement of Activated Charcoal and Cartridges Oil Filter of N2 Plant   1.0 OBJECTIVE : 1.1 To lay down a procedure for Replacement of Activated Charcoal and Cartridge oil filter of N2 Plant. 2.0. SCOPE : 2.1 This procedure is applicable for replacement of Activated Charcoal and Cartridge Oil filter of N2 Plant … Read more