Gowning and D-gowning Procedure for workers staff and visitors in production Department

    Gowning and D-gowning Procedure for workers, staff and visitors in production Department 1.0 OBJECTIVE 1.1 To lay down a procedure to be followed for Entry & Exit of Executives, Staff, and Visitors in production area (gowning and degowning procedure). 2.0 SCOPE 2.1 This standard operating procedure is applicable for the entry in capsule … Read more

amv report for paracetamol injection

  amv report for paracetamol injection Name of Product   PARACETAMOL INJECTION     Parameter         Analytical Method Validation for Paracetamol Injection  by HPLC Method followed     By HPLC     Supersede No.            Nil Total No of pages 19 Effective Date   TABLE OF CONTENTS Sr. No. Title Page — Product Description — Table of contents 1.0 Document … Read more

AMV Protocol for Sterility by Filtration Method

  AMV Protocol for Sterility by Filtration Method Analytical Method Verification  Protocol for Sterility by Filtration Method   Sr. No. Title Page No. — Table Of Contents 1.0 Protocol Approval 2.0 Qualification Team and Responsibilities 3.0 Introduction, Objective and Scope 3.1 Objective 3.2 Scope 4.0 Performance Qualification Pre-requisites 5.0 References 6.0 Performance Qualification Procedure 7.0 … Read more

Torrent Pharma Walk in Drive

Torrent Pharma Walk in Drive Torrent Pharma  is offering a walk in drive for females only . Full details of the Job is given below. Description of the job  Vacant post –Quality Control Education required – Bpharma , M.sc Experience Required – 2 to 7 years Contact Person: Shikha Sharma & Sandeep Kapil – 9805508451 … Read more

sop for Performance Qualification Protocol for Bottle Washing Machine

  sop for Performance Qualification Protocol for Bottle Washing Machine   PERFORMANCE QUALIFICATION PROTOCOL 1.0 APPROVAL: 1.1  This protocol is prepared by QA   Department Quality Assurance Signature Name Designation Date   1.2 This protocol is reviewed by validation team Department Quality Assurance Production Engineering Signature Name Designation Date 2.0  TABLE OF CONTENT: SR. NO. … Read more

sop for Operation and Cleaning of Purified Water Generation System

  sop for Operation and Cleaning of Purified Water Generation System   1.0 OBJECTIVE : 1.1 To lay down a procedure for operation and cleaning of Purified water Generation System. 2.0. SCOPE : 2.1 This procedure is applicable for operation and cleaning of Purified water Generation System situated 3.0. RESPONSIBILITY : 3.1 Operator Engineering Department … Read more

sop for Change control

  sop for Change control     1.0 OBJECTIVE : 1.1 To lay down a procedure for initiating, reviewing, approving/rejecting, implementing and closing the change in approved and/or validated states of quality system. 2.0. SCOPE : 2.1 This procedure is applicable to Initiation, Review and Evaluation, Approval/Rejection, Implementation and closure of change control procedure at … Read more

sop for approval of Contract Parties

  sop for approval of Contract Parties   1.0 OBJECTIVE : 1.1 To lay down a procedure for approval of contract parties. 2.0. SCOPE : 2.1 This procedure is applicable to approve contract parties providing services 2.1.1 Contract testing, 2.1.2 Annual maintenance service, 2.1.3 Calibration/validation service, 2.1.4 Laundry service, 2.1.5 Pest-control service, 2.1.6 Fire-extinguisher service, … Read more

sop for cleaning and sanitization of raw water and soft water

  sop for cleaning and sanitization of raw water and soft water   1.0 OBJECTIVE : 1.1 To lay down a procedure for cleaning and sanitization of raw water and soft water storage tank. 2.0. SCOPE : 2.1 This procedure is applicable to all the raw water and soft water storage tanks situated at abc … Read more

error: Content is protected !!