sop for for Cleaning and Sterilization of Goggles
1.0 OBJECTIVE:
1.1 To lay down the procedure for Cleaning and Sterilization of Goggles.
2.0 SCOPE:
2.1 This SOP is applicable to Cleaning and Sterilization of Goggles in Injection (Parenteral) Area
3.0 RESPONSIBILITY:
3.1 Officer / Executive – Production
4.0 ACCOUNTABILITY:
4.1 Head – Production
5.0 PROCEDURE:
5.1 Collect all sterile area Goggles in SS container and bring them to Unit preaparation.
5.2 Clean the goggles with purified water.
5.3 Clean the SS container using lint free mop with 70% IPA.
5.4 Using Lint free Mop and flush them with Purified Water till frothing disappears.
5.5 Keep the goggles in SS container.
5.6 Sterilize the goggles at 121.4°C for 30 minutes along with other accessories.
5.7 Open the door from sterile area and unload the goggles under Laminar Air Flow unit in cooling zone.
Then transfer them in sterile garment cabinet.
5.8 Record the cleaning and sterilization details of goggles in Annexure-I.
5.9 Record the details of goggles sterilization Cycles as per Annexure-II.
5.10 Sterilization cycles of goggles should not be more than 120. The goggles shall be discarded
after 120 sterilization cycles or in case of physical damages in presence of IPQA person.
5.11 Frequency: Daily
6.0 ABBREVIATION:
Sr. No. | Abbreviation used | Full form of abbreviation used |
1. | SOP | Standard Operating Procedure |
2. | WFI | Water for Injection |
3. | Ltd. | Limited |
4. | No. | Number |
5. | QA | Quality Assurance |
6. | IPA | Iso-propyl-alcohol |
7. | UV | Ultraviolet Light |
7.0 ATTACHMENTS (ANNEXES) :
Annex-I: Cleaning & Sterilization Record of Goggles
Annex-II: Sterilization Cycles Record of Goggles
8.0 REFRENCE:
In-House
Annex-I
CLEANING & STERILIZATION RECORD OF GOGGLES
Department: Production Month / Year
Date | Cleaning Period | No. of Goggles Set Cleaned | Done By
Sign & Date |
Checked
By Sign & Date |
Sterilization Period | No. of Goggles Set Set Sterilized | Done By Sign & Date | Checked
By Sign & Date |
||
From | To | From | To | |||||||
Annex-II
STERILIZATION CYCLES RECORD OF GOGGLES
Department: Line:
Goggles I.D. No.: Date of Issuance:
Date | ||||||||||
Cycle | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 88 | 89 | 90 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 91 | 92 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 100 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 |
Done By
Sign & Date |
||||||||||
Date | ||||||||||
Cycle | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 |
Done By
Sign & Date |
Discarded & Destroyed on:
Reason
Sign/Date (Production) Sign/Date (QA):