Analysis of Oxcarbazepine Tablets
Analysis of Oxcarbazepine Tablets TEST PROCEDURE / METHODS 01. Description: Remove 20 tablets from the strip. Place on a white paper and observe visually. 02. Identification In the assay, the principle … Read more
Analysis of Oxcarbazepine Tablets TEST PROCEDURE / METHODS 01. Description: Remove 20 tablets from the strip. Place on a white paper and observe visually. 02. Identification In the assay, the principle … Read more
Analysis of Levocetirizine Tablets TESTS TEST PROCEDURE / METHODS 01. Description Remove 20 tablets from the strip. Place on a white paper and observe visually. 02. Identification In the assay, the principle peak in the chromatogram obtained with the test solution corresponds to the peak in the chromatogram obtained with reference … Read more
analysis of Acarbose 25 mg Tablet 01. Description : Remove 20 tablets from the strip. Place on a white paper and observe visually. 02. Average Weight: Weigh accurately 20 tablets and calculate … Read more
Pharma jobs in Roorkee Pharma jobs in Roorkee details are detail given below. 1) computer operators Qualifications B Com Knowledge in tally 2) Store incharge in pharmaceutical Qualifications Graduation 3) Receptionist in pharmaceutical Female Qualification graduation Location Roorkee Contact Heena 8077561364 Mail– rajspice634@gmail.com join our whats app group
sop for Breakdown of Equipment and Machineries 1.0. OBJECTIVE : 1.1 To lay down a procedure for breakdown of equipments and machineries. 2.0. SCOPE : 2.1 This procedure is applicable to attend the breakdown of all Machines, Equipment used in the Plant. 3.0. RESPONSIBILITY : 3.1 HOD of Dept Informed to EM … Read more
Cleaning and Replacement of HVAC LAF Other Clean Air Filters and Monitoring of HEPA Filters OBJECTIVE : 1.1 To lay down a procedure for Procurement, Storage , Cleaning , Replacement of HVAC / LAF / Other clean Air Filters and Monitoring of HEPA Filters. 2.0. SCOPE : 2.1 This procedure is applicable for … Read more
Preventive Maintenance of Building premises and surrounding 1.0 OBJECTIVE : 1.1 To lay down a procedure for carrying out Preventive maintenance of building, premises and surroundings. 2.0. SCOPE : 2.1 This procedure covers painting, civil work to be done in case of wear and tear, maintenance of the door closures, repair of the … Read more
Operation and cleaning of UV bank installed on Purified Water Line 1.0 OBJECTIVE : 1.1 To lay down a procedure for Operation and cleaning of UV bank installed in Purified Water Line. 2.0. SCOPE : 2.1 This procedure is applicable for UV lamps of UV bank installed on Purified Water Line situated … Read more
sop for BMS system handling for Air Handling Unit 1.0 OBJECTIVE : 1.1 To lay down a procedure for carrying out BMS (Building management system system) handling for Air Handling Units 2.0 SCOPE : 2.1 This procedure is applicable to BMS (Building management system system) system for HVAC situated at Pharma dekho. … Read more
sop for Operation of Soft Water Plant 1.0 OBJECTIVE : 1.1 To lay down a procedure for operation of Soft water plant 2.0. SCOPE : 2.1 This procedure is applicable to operation of Soft Water plant 3.0. RESPONSIBILITY : 3.1 Operator Engineering Department shall be responsible for operation of Soft water Plant 3.2 … Read more