Analysis of Levocetirizine Tablets

    Analysis of Levocetirizine Tablets   TESTS TEST PROCEDURE / METHODS   01. Description Remove 20 tablets from the strip. Place on a white paper and observe visually. 02. Identification In the assay, the principle peak in the chromatogram obtained with the test solution corresponds to the peak in the chromatogram obtained with reference … Read more

Pharma jobs in Roorkee

Pharma jobs in Roorkee Pharma jobs in Roorkee details are detail given below.  1) computer operators Qualifications B Com Knowledge in tally  2) Store incharge in pharmaceutical Qualifications Graduation  3) Receptionist in pharmaceutical Female Qualification graduation Location Roorkee Contact Heena 8077561364 Mail–  rajspice634@gmail.com join our whats app group 

sop for Breakdown of Equipment and Machineries

    sop for Breakdown of Equipment and Machineries   1.0. OBJECTIVE : 1.1 To lay down a procedure for breakdown of equipments and machineries. 2.0. SCOPE : 2.1 This procedure is applicable to attend the breakdown of all Machines, Equipment used in the Plant. 3.0. RESPONSIBILITY : 3.1 HOD of Dept Informed to EM … Read more

Cleaning and Replacement of HVAC Clean Air Filters

  Cleaning and Replacement of HVAC LAF Other Clean Air Filters and Monitoring of HEPA Filters   OBJECTIVE : 1.1 To lay down a procedure for Procurement, Storage , Cleaning , Replacement of HVAC / LAF / Other clean Air Filters and Monitoring of HEPA Filters. 2.0. SCOPE : 2.1 This procedure is applicable for … Read more

Preventive Maintenance of Building premises and surrounding

  Preventive Maintenance of Building premises and surrounding   1.0 OBJECTIVE : 1.1 To lay down a procedure for carrying out Preventive maintenance of building, premises and surroundings. 2.0. SCOPE : 2.1 This procedure covers painting, civil work to be done in case of wear and tear, maintenance of the door closures, repair of the … Read more

Operation and cleaning of UV bank installed on Purified Water Line

    Operation and cleaning of UV bank installed on Purified Water Line   1.0 OBJECTIVE : 1.1 To lay down a procedure for Operation and cleaning of UV bank installed in Purified Water Line. 2.0. SCOPE : 2.1 This procedure is applicable for UV lamps of UV bank installed on Purified Water Line situated … Read more

sop for BMS system handling for Air Handling Unit

    sop for BMS system handling for Air Handling Unit   1.0 OBJECTIVE : 1.1 To lay down a procedure for carrying out BMS (Building management system system) handling for Air Handling Units 2.0 SCOPE : 2.1 This procedure is applicable to BMS (Building management system system) system for HVAC situated at Pharma dekho. … Read more

sop for Operation of Soft Water Plant

    sop for Operation of Soft Water Plant 1.0 OBJECTIVE : 1.1 To lay down a procedure for operation of Soft water plant 2.0. SCOPE : 2.1 This procedure is applicable to operation of Soft Water plant 3.0. RESPONSIBILITY : 3.1 Operator Engineering Department shall be responsible for operation of Soft water Plant 3.2 … Read more

error: Content is protected !!