sop for charge hand over between the shifts
1, FROM CURRENT SHIFT TO NEXT SHIFT
• Following are the instructions to be given by current shift officer to the next shift officer for charge
• hand over.
• Name of product/lot/workmen on each machine.
• Status of each machine whether under changeover or under maintenance or functioning.
• Allocation of job to next shift workers
• Production planning for next shift.
• Any special precautions to be taken if there is any problem.
• If any change in plan, then reason for that change. Any anticipated problem and remedy if any.
• Showing the actual physical status.
• Recording of above things in shift logbook.
2 FROM 2 SHIFT TO 1 SHIFT (GENERAL SHIFT)
• Second shift officer has to write jobs done in his shift on shift logbook along with the instructions for
• 1 shift.
• Description of the work completed in the second shift.
• Reason for not completing the job given to 2 shift, if there is any.
• Precautions to be taken by the first shift officer (or general shift) before starting the production. Le. completion of maintenance and cleaning jobs.
• Any special instructions concerned with machine, product, manpower etc.
• Details of any problem that occurs in shift should be written in the shift logbook.
• First shift work should refer these instructions before starting the work.
process validation protocol for methylcobalamin niacinamide and pyridoxine injection
validation protocol of sterility test
sop for Analytical Method Transfer
Protocol for hold time study of sterile garments
sop for swab sampling for validation of clean surfaces
cleaning validation maco and noel calculation formula
sop for performance qualification for analyst
Sop for Validation report for disinfectant efficacy
Sop for Method validation report for bacterial endotoxin test
Sop for method validation microbiology sterility testing
sop for validation report for preservative efficacy test
sop for Protocol cum report for efficacy qualification of uv light
sop for validation protocol for uv light efficacy of dpb & laf
sop for cleaning validation protocol tablet manufacturing equipment
sop for cleaning validation protocol ointment manufacturing equipment
concurrent process validation for rabeprazole ec and domperidone sr capsules
sop for Validation for cleaning procedure liquid injection
sop for Validation for cleaning procedure dry powder injection
Preparation Approval Control and Distribution of Master Formula Records
calibration policy for equipment and instruments
evaluation Sampling of Raw Materials questionnaire
training evaluation questionnaire
sop for approval of Contract Parties
sop for Operation and Cleaning of Purified Water Generation System