sop for charge hand over between the shifts

 

sop for charge hand over between the shifts

1, FROM CURRENT SHIFT TO NEXT SHIFT

• Following are the instructions to be given by current shift officer to the next shift officer for charge
• hand over.
• Name of product/lot/workmen on each machine.
• Status of each machine whether under changeover or under maintenance or functioning.
• Allocation of job to next shift workers
• Production planning for next shift.
• Any special precautions to be taken if there is any problem.
• If any change in plan, then reason for that change. Any anticipated problem and remedy if any.
• Showing the actual physical status.
• Recording of above things in shift logbook.



2 FROM 2 SHIFT TO 1 SHIFT (GENERAL SHIFT)
• Second shift officer has to write jobs done in his shift on shift logbook along with the instructions for
• 1 shift.
• Description of the work completed in the second shift.
• Reason for not completing the job given to 2 shift, if there is any.
• Precautions to be taken by the first shift officer (or general shift) before starting the production. Le. completion of maintenance and cleaning jobs.
• Any special instructions concerned with machine, product, manpower etc.
• Details of any problem that occurs in shift should be written in the shift logbook.
• First shift work should refer these instructions before starting the work.

 

process validation protocol for methylcobalamin niacinamide and pyridoxine injection

validation protocol of sterility test

sop for Analytical Method Transfer

Protocol for hold time study of sterile garments

sop for process validation

sop for swab sampling for validation of clean surfaces

cleaning validation maco and noel calculation formula

sop for performance qualification for analyst

Sop for Validation report for disinfectant efficacy

Sop for Method validation report for bacterial endotoxin test

Sop for method validation microbiology sterility testing

sop for validation report for preservative efficacy test

sop for Protocol cum report for efficacy qualification of uv light

sop for validation protocol for uv light efficacy of dpb & laf

sop for cleaning validation protocol tablet manufacturing equipment



sop for cleaning validation protocol ointment manufacturing equipment

concurrent process validation for rabeprazole ec and domperidone sr capsules

sop for Validation for cleaning procedure liquid injection

sop for Validation for cleaning procedure dry powder injection

sop for validation plan

Preparation Approval Control and Distribution of Master Formula Records

calibration policy for equipment and instruments

sop for stability management

evaluation Sampling of Raw Materials questionnaire

training evaluation questionnaire

sop for approval of Contract Parties

sop for Operation and Cleaning of Purified Water Generation System

 

Leave a Comment

error: Content is protected !!