master list of documents Engineering
S. No. | Title of the Document | Document No. | Revision No. | Effective Date | Next Review Date |
1. | Operation of Bore well | ER/001 | |||
2. | Testing of Chlorine Content in Water | ER/002 | |||
3. | Operation & Backwash of Multi Grade Filter | ER/003 | |||
4. | Testing of Hardness of Soft Water | ER/004 | |||
5. | Operation of Softener Plant | ER/005 | |||
6. | Preparation of Sodium Meta Bisulphate Solution | ER/006 | |||
7. | Preparation of Sodium Hypo Chlorite Solution | ER/07 | |||
8. | Operation of Purified Water Generation Plant | ER/08 | |||
9. | Operation of Purified Water Loop | ER/09 | |||
10. | Sanitization of Purified Water Loop | ER/010 | |||
11. | Sanitization of Hot Sanitization Reverse Osmosis & Electro Deionization Unit | ER/011 | |||
12. | Chemical Sanitization of Reverse Osmosis | ER/012 | |||
13. | Sanitization of Ultra Filtration System | ER/013 | |||
14. | Sanitization of Multi Column Plant | ER/014 | |||
15. | Cleaning of Under Ground Water Tanks | ER/015 | |||
16. | Cleaning of Over Head Water Tanks (HDPE) | ER/016 | |||
17. | Cleaning of Pure Steam Generator | ER/017 | |||
18. | Operation of Boiler | ER/018 | |||
19. | Operation of Water Chilling Plant | ER/019 | |||
20. | Operation of Air Compressor | ER/020 | |||
21. | Operation of Filter Cleaning Booth | ER/021 | |||
22. | Operation of Cooling Tower | ER/022 | |||
23. | Operation of Air Handling Unit | ER/023 | |||
24. | Operation of Pure Steam Generator | ER/024 | |||
25. | Operation of Multi Column Distillation Plant | ER/025 | |||
26. | Operation of Diesel Generator | ER/026 | |||
27. | Operation of Effluent Treatment Plant | ER/027 | |||
28. | Operation of Dust Extraction System. | ER/028 | |||
29. | Operation of Fire- Fighting (Hydrant) System | ER/029 | |||
30. | Operation of Lift | ER/030 | |||
31. | Building Maintenance | ER/031 | |||
32. | Maintenance Work Requisition | ER/032 | |||
33. | Preventive maintenance Policy | ER/033 | |||
34. | Preventive maintenance of Purified Water System | ER/034 | |||
35. | Preventive Maintenance of Transformers | ER/035 | |||
36. | Preventive Maintenance of Chilling Plant | ER/036 | |||
37. | Preventive Maintenance of Air Compressor | ER/037 | |||
38. | Preventive maintenance of Boiler | ER/038 | |||
39. | Preventive Maintenance of Cooling Towers | ER/039 | |||
40. | Preventive Maintenance of Diesel Generator | ER/040 | |||
41. | Preventive Maintenance of Air Handling Units | ER/041 | |||
42. | Preventive Maintenance of Air Curtain | ER/042 | |||
43. | Preventive Maintenance of Vibro Sifter | ER/043 | |||
44. | Preventive Maintenance of Paste Preparation Vessel | ER/044 | |||
45. | Preventive Maintenance of Lifting and Positioning Device | ER/045 | |||
46. | Preventive Maintenance of Octagonal Blender | ER/046 | |||
47. | Preventive Maintenance of Conta Blender | ER/047 | |||
48. | Preventive Maintenance of Fluid Bed Dryer | ER/048 | |||
49. | Preventive Maintenance of Rapid Mixer Granulator | ER/049 | |||
50. | Preventive Maintenance of Sifter Cum Multimill | ER/050 | |||
51. | Preventive Maintenance of Packing Conveyor Belt | ER/051 | |||
52. | Preventive Maintenance of Compression Machine | ER/052 | |||
53. | Preventive Maintenance of Auto Coater | ER/053 | |||
54. | Preventive Maintenance of Capsule Filling Machine AF-90T | ER/054 | |||
55. | Preventive Maintenance of Capsule Polishing and Sorting Machine | ER/055 | |||
56. | Preventive Maintenance of Blister Packing Machine | ER/056 | |||
57. | Preventive Maintenance of Strip Packing Machine | ER/057 | |||
58. | Preventive Maintenance of De-Foiling Machine | ER/058 | |||
59. | Preventive Maintenance of Linear Bottle Washing Machine | ER/059 | |||
60. | Preventive Maintenance of Liquid Filling and Sealing Machine | ER/060 | |||
61. | Preventive Maintenance of sticker labeling machine | ER/061 | |||
62. | Preventive Maintenance of Turn Table | ER/062 | |||
63. | Preventive Maintenance of Hi- Cart | ER/063 | |||
64. | Preventive Maintenance of Inspection Table | ER/064 | |||
65. | Preventive Maintenance of Vial Washing Machine | ER/065 | |||
66. | Preventive Maintenance of Powder Filling and Rubber Stoppering machine | ER/066 | |||
67. | Preventive Maintenance of Vial Sealing Machine | ER/067 | |||
68. | Preventive Maintenance of Depyrogenation Tunnel. | ER/068 | |||
69. | Preventive Maintenance of Pure steam Generator | ER/069 | |||
70. | Preventive Maintenance of Steam Sterilizer (Autoclave) | ER/070 | |||
71. | Preventive Maintenance of Multi Column Distillation Plant | ER/071 | |||
72. | Preventive Maintenance of Garment Washing Machine | ER/072 | |||
73. | Preventive Maintenance of Lozenges Manufacturing Line | ER/073 | |||
74. | Preventive Maintenance of Laminar Air Flow unit | ER/074 | |||
75. | Preventive Maintenance of Vacuum Cleaner | ER/075 | |||
76. | Preventive Maintenance of Lift | ER/076 | |||
77. | Preventive Maintenance of Battery stacker | ER/077 | |||
78. | Preventive Maintenance of Infrared Drier (Umbrella Type) | ER/078 | |||
79. | Area Validation | ER/079 | |||
80. | Procedure for Calibration of Temperature Controller | ER/080 | |||
81. | Procedure for Calibration of Pressure Gauge | ER/081 | |||
82. | Procedure for Calibration of Vacuum Gauge | ER/082 | |||
83. | Procedure for Calibration of Magnehelic Gauge | ER/083 | |||
84. | Filter Cleaning of HVAC System | ER/084 | |||
85. | Disposal of Engineering Waste | ER/085 | |||
86. | Replacement Policy | ER/086 | |||
87. | Colour Coding of Piping and Accessories of Utilities | ER/087 | |||
88. | Action Plan In Case Of Electrical Power Failure | ER/088 | |||
89. | Methodology To Dispose ETP Sludge | ER/089 | |||
90. | Manual for Safety (Solid & Liquid Dosage Formulation) | ER/090 | |||
91. | Preventive Maintenance of Effluent Treatment Plant | ER/091 | |||
92. | Preventive Maintenance of Insecticutors | ER/092 | |||
93. | Entry / Exit procedure in Water System Room | ER/093 | |||
94. | Passivation of Purified Water Distribution Loop | ER/094 | |||
95. | Passivation of WFI Distribution Loop | ER/095 | |||
96. | Operation of Fire- Extinguisher | ER/096 | |||
97. | Preventive Maintenance of Fire-Fighting system | ER/097 | |||
98. | Breakdown maintenance of machine | ER/098 | |||
99. | Checking Light Intensity | ER/099 | |||
100. | Preventive Maintenance of Carton Printing Machine | ER/100 | |||
101. | Preventive Maintenance of Collator Belt | ER/101 | |||
102. | Preventive Maintenance of Colloidal Mill | ER/102 | |||
103. | Preventive Maintenance of Strip De-Foiling Machine | ER/103 | |||
104. | Preventive Maintenance of Dosing Cup Elevator | ER/104 | |||
105. | Preventive Maintenance of Liquid Tanks | ER/105 | |||
106. | Preventive Maintenance of Liquid Transfer Pumps | ER/106 | |||
107. | Preventive Maintenance of ROPP Cap Elevator | ER/107 | |||
108. | Preventive Maintenance of Shrink Sleeve Machine | ER/108 | |||
109. | Preventive Maintenance of Sugar Transfer System | ER/109 | |||
110. | Preventive Maintenance of Filter Press | ER/110 | |||
111. | Procedure of Issuance of material from Engineering Store | ER/111 | |||
112. | Operation and regeneration of Softener Plant | ER/112 | |||
113. | Preparation of Sodium Hydroxide Solution | ER/113 | |||
114. | Cleaning of Soft water storage tank and RO feed tank | ER/114 | |||
115. | Replacement of UV light of Purified water plant | ER/115 | |||
116. | Replacement of Tube lights | ER/116 | |||
117. | Procedure for battery backup in mobile LAF Trolley | ER/117 | |||
118. | Replacement of 0.2 micron filters | ER/118 | |||
119. | Replacement of HVAC filters | ER/119 | |||
120. | Preventive Maintenance of Dust Collector | ER/120 | |||
121. | Preventive Maintenance of Rapid cooling steam Generator | ER/121 | |||
122. | Preventive Maintenance of Rapid cooling Steam Sterilizer L&L | ER/122 | |||
123. | Preparation of R.O. Antiscalent Solution | ER/123 | |||
124. | Replacement of Battery of Electronic Device | ER/124 | |||
125. | Replacement of Vent Filters | ER/125 |
sop for replacement of water system filters
cleaning and preventive maintenance of insectocutor
sop for operation of preventive maintenance
sop for material receiving and consumption record
sop for Preventive maintenance of bottle washing machine
sop for Replacement of Battery of Electronic Devices
sop for Preparation of R.O. Antiscalant Solution
Preventive Maintenance of Rapid Cooling Steam Sterilizer
Preventive Maintenance of Rapid cooling steam Generator
sop for Preventive Maintenance of Dust Collector
sop for Replacement of HVAC filters
SOP for Battery Backup in Mobile Laminar Air Flow Trolley
sop for Replacement of Tube lights
sop for Replacement of UV light of purified water plant
sop for Cleaning of soft water storage tank and RO feed tank
sop for Preparation of Sodium hydroxide Solution
sop for Operation and regeneration of softener plant
Procedure Of Issuance Of material from Engineering Store
sop for Preventive Maintenance of Filter Press
sop for Preventive Maintenance of Sugar Transfer System
sop for Preventive Maintenance of Shrink Sleeve Machine
sop for Preventive Maintenance of ROPP Cap Elevator
sop for Preventive Maintenance of Liquid Transfer Pumps
sop for Preventive Maintenance of Liquid Tanks
Preventive Maintenance of Strip De-Foiling Machine
sop for Preventive Maintenance of Colloidal Mill
sop for Preventive Maintenance of Packing Collator Belt
sop for Checking light intensity
sop for Operation of Fire- Extinguisher
sop for Passivation of WFI Distribution Loop
sop for Analysis of Effluent Treatment Plant Water
sop for Methodology to Dispose ETP Sludge
sop for Action Plan In Case Of Electrical Power Failure
sop for Colour Coding of Piping and Accessories of Utilities
sop for Disposal of Engineering Waste
Filter Cleaning of HVAC System RLAF & LAF
Procedure for Calibration of Magnehelic Gauge
Procedure for Calibration of Vacuum Gauge