sop for Air Handling Unit AHU

 

sop for Air Handling Unit AHU

 

OBJECTIVE :
1.1 To lay down the procedure for Operation of Air Handling Unit

2.0. SCOPE :

2.1 This procedure is applicable for the Operation of Air Handling Unit situated at abc company.

3.0. RESPONSIBILITY :

3.1 Operator Engineering Department shall be responsible for operation of Air Handling Unit.
3.2 Officer/Executive Engineering Department shall be responsible for to verify the proper operation and to take corrective action if any operational deviation

4.0. ACCOUNTABILITY :

4.1 Head Engineering Department shall be responsible for compliance of SOP.

5.0. PROCEDURE :

5.1. PRIMARY CHECKS:
5.1.1. Ensure that chilled water inlet and outlet valves are open.
5.1.2. Ensure that chilled water outlet temperature is not more than 9ºC and pump outlet pressure is not less than 1.5 Kg/cm².
5.1.3. Ensure that the setting of supply air damper and return air damper of AHU are as per the mark at the time of validation.
5.1.4. Ensure that the condensate drain valve is open.
5.2. STARTING PROCEDURE:
5.2.1. Switch `On’ the mains.



5.2.2. Check the blower for any abnormal noise and vibrations and rectify it, if required.
5.3. MONITORING OF PRESSURE DIFFERENTIAL ACROSS SUPPLY PLENUM FILTER.
5.3.1 Check and record the manometer reading of the associated unit. It should read 8-35 mm WC. In case the manometer reading is above 35 mm WC, the filter is due for cleaning. In case the gauge reads below 8 mm WC, inform to the Engineering Head for corrective action.
5.3.2 Record the above data once in a day in Annex –I.
5.4. SHUT OFF PROCEDURE:
5.4.1 Switch ‘Off ’ the mains.
5.5 FUMIGATION AND DEFUMIGATION
5.5.1. After getting instruction from Parenteral department for fumigation activity, EM operator shall switch off AHU and close fresh air damper and then inform to Parenteral department. EM operator shall be filled the column ‘Before Fumigation’ of Annex-II.
5.5.2. After AHU shut off , operator EM dept shall inform to Parenteral Department Officer/Operator that AHU has been shut off.
5.5.3. Parenteral Officer/Operator shall carry out the fumigation activity as per SOP NO:1SP-043.
5.5.4. After completion of fumigation activity, Parenteral department shall inform to EM department. EM dept shall run the AHU for 5 minute and then switch OFF the AHU. operator EM dept shall fill ‘During Fumigation’ column of Annex-II.
5.5.5. On Next day in the morning as per production schedule , Parenteral department shall inform to EM dept to switch on the AHU and to open the fresh air damper for de-fumigation purpose.
5.5.6. Operator EM department shall switch on AHU and open the fresh air damper. Operator EM dept shall fill ‘De-fumigation’ column of Annex-II.
5.5.7. For each activity i.e. before fumigation, during fumigation and de-fumigation operator/officer EM department shall ensure that the damper of recirculation air is open.



6.0. ABBREVIATION :

Sr. No. Abbreviation used Full form of abbreviation used
1   AHU Air handling unit
2   SOP Standard Operating Procedure
3   EM Engineering and maintenance

7.0 ATTACHMENTS (ANNEXES) :

Annex-I : Log sheet for Air Handling Unit.
Annex –II : Record of AHU handling for fumigation.

8.0. REFERENCE :

Sr. No. Reference Title Author Name Edition Page No.

 

sop for Execution of Preventive Maintenance

Preparation of Sodium Hydroxide Solution

sop for Breakdown Maintenance

sop for Handling of Filters

sop for water cooled chiller operation

cleaning and preventive maintenance of LAF and RLAF

sop for replacement of water system filters

cleaning and preventive maintenance of insectocutor

sop for operation of preventive maintenance

sop for material receiving and consumption record

sop for Preventive maintenance of bottle washing machine



sop for Replacement of Battery of Electronic Devices

sop for Preparation of R.O. Antiscalant Solution

Preventive Maintenance of Rapid Cooling Steam Sterilizer

Preventive Maintenance of Rapid cooling steam Generator

sop for Preventive Maintenance of Dust Collector

sop for Replacement of HVAC filters

SOP for Battery Backup in Mobile Laminar Air Flow Trolley

sop for Replacement of Tube lights

sop for Replacement of UV light of purified water plant

sop for Cleaning of soft water storage tank and RO feed tank

sop for Preparation of Sodium hydroxide Solution

sop for Operation and regeneration of softener plant

Procedure Of Issuance Of material from Engineering Store

sop for Preventive Maintenance of Filter Press

sop for Preventive Maintenance of Sugar Transfer System

sop for Preventive Maintenance of Shrink Sleeve Machine

sop for Preventive Maintenance of ROPP Cap Elevator

sop for Preventive Maintenance of Liquid Transfer Pumps

sop for Preventive Maintenance of Liquid Tanks

Preventive Maintenance of Strip De-Foiling Machine

sop for Preventive Maintenance of Colloidal Mill

sop for Preventive Maintenance of Packing Collator Belt

sop for Checking light intensity

sop for Operation of Fire- Extinguisher

sop for assigning identification to filters

sop for Engineering Spares Parts Inventory Control

sop for Air Handling Unit AHU

 

Leave a Comment

error: Content is protected !!