sop for operation and cleaning of strip packing machine
1.0 Purpose
1.1 To lay down a procedure for Operation and cleaning of Strip packing machine.
2.0 Scope
2.1 This SOP is applicable for Operation and cleaning of Strip packing machine in ABC Pvt. Ltd., Roorkee (UK), India.
3.0 Responsibility
3.1 Production Chemist To follow the Procedure & Execute the activity.
Trained Machine Operator To execute the activity as per SOP.
4.0 Accountability
4.1 Production Head is accountable for compliance of this SOP.
5.0 Procedure
5.1 Pre starts up
5.1.1 Visually inspect the Strip packing machine and the area for cleanliness.
5.1.2 Ensure and check that the environmental conditions are as specified in the BPR.
5.1.3 Remove the ‘cleaned’ label from the equipment.
5.1.4 Check and ensure the rolls of plain and printed aluminum foils issued for the products are correct.
5.1.5 Get the line clearance from the QA officer.
5.1.6 Check that the change parts mounted on the machine are as per required for the product.
5.1.7 Mount the batch coding printing unit to the machine.
5.2 Start up
5.2.1 Switch ‘ON’ the main supply and heat-sealing roller of machine.
5.2.2 Switch ‘ON’ heater and set heater auto or manual mode, set the temperature of heater
Roller by temp. controller as specified in BPR.
5.2.3 Turn the knob to ‘INCHING’ mode.
5.2.4 Fix the batch coding stereos on the batch coding printing unit drum.
5.2.5 Soak the felt roller of printing unit with blue color ink.
5.2.6 Mount the foil rolls on respective shafts.
5.2.7 Load the plain and printed Aluminum Foil and adjust its alignment from the roll up to the sealing
rollers through the batch coding printing unit.
5.2.8 Switch ON the machine and take out the strip pack overprinting proof of stereos impression.
5.2.9 Check the Aluminum foil for correct batch details as specified in the BPR.
5.2.10 Check the text matter printed on printed Aluminum foil and counter checked by QA officer.
5.2.11 Ensure that the heat-sealing rollers have attained their relative temperature as specified in BPR.
5.2.12 Pass the plain and printed foil through the sealing roller to check the sealing performance.
5.2.13 Ensure that the central cutter is functioning properly.
5.2.14 Adjust the cutting length of the strip as required.
5.2.15 Adjust the bowl on the vibrator in such manner that its discharge openings are exactly in line
with the entry openings of the upper end of the channels.
5.2.16 Adjust the channel on its holding bracket in such a way that it is located exactly between the rollers.
The centerline of the channel should coincide as far as possible with the centerline between the rollers.
5.3 Operation
5.3.1 Load the tablets/Capsule in the hopper.
5.3.2 Set the channel on its alignment by moving the knob and ensure the proper tablet/Capsule dropping.
5.3.3 Adjust the vibrator speed by rotating the vibrator through the knob in clock wise/or anti-clock wise as required.
5.3.4 Turn the knob to ‘RUN’ mode.
5.3.5 Set the speed by moving motor drive wheel to the desired limit.
5.3.6 Press “switch” to run the machine and continue the operation as required.
5.3.7 On the start of the machine, critically examine the first 10 -15 strip pack for defect such as.
(a) Miss-printing on Aluminum foil
(b) Improper cutting of strip
(c) Improper sealing is to check by using Leak test apparatus.
(d) Other defects such as scratch on strips.
Note-: If there is any defect as mentioned above then the machine is to run only after the rectification of the defects.
5.3.8 Safety Features: Do not touch the heaters while is “ON” position.
5.4 Unloading and Shut Down
5.4.1 If the machine is stopped due to breakdown the following sequence of operation must be followed.
(a) Stop the vibrator first.
(b) Push the red button to stop the machine.
(c) Remove the chute from its alignments.
(d) Switch ‘OFF’ the heat-sealing roller.
(e) Any tablet/capsule, which comes in contact with the roller, is removed and discarded.
5.4.2 Remove the tablet/capsule from the Hopper, bowl plate and channel & ensure that no
5.4.3 Tablet/capsule remains in the machine when going to shut down or in case of machine breakdown.
5.4.4 Switch ‘OFF’ the main power supply.
5.4.5 Record the activity in Equipment Log book (Format No. IPLPG001/F/01-00)
5.5 Cleaning
5.5.1 Type A: for Product-to-Product Changeover
5.5.1.1 Update the status board as “UNDER CLEANING”.
5.5.1.2 Switch OFF the machine and main supply.
5.5.1.3 Remove the stereos from the stereo drum and destroy them as per SOP.
5.5.1.4 Remove and take out both the remaining Aluminium foils
5.5.1.5 De dust the machine body, hopper, bowl plate & channel by using vacuum cleaner in case of
Uncoated tablet & In case of coated Tablet/Capsule clean the machine body with lint free cloth.
5.5.1.6 The whole area and ensure that there is no residue of the previous product.
5.5.1.7 Dismantle the hopper & vibrating bowl plate by removing the bolts.
5.5.1.8 Dismantle the parts i.e. SS channel, cover plate, knob & spring loaded S.S release piece.
5.5.1.9 Clean all dismantle parts of the machine by using Raw water and then clean with purified water.
5.5.1.10 Dry cleans all other parts and whole Machine by using lint free clean cloth.
5.5.1.11 Note: If required clean the heat-sealing roller with brass wire brush to remove any lumps
of polyethylene, dirt & pieces of laminate.
5.5.1.12 Assemble all the dismantled parts of the machine.
5.5.2 Record the cleaning details in the Equipment Log book.
5.5.3 Type B: for Batch-to-Batch Changeover
5.5.3.1 Update the status board as” UNDER CLEANING”.
5.5.3.2 Switch OFF the machine and main supply.
5.5.3.3 Remove the stereos from the stereo drum and destroy them as per SOP.
5.5.3.4 De dust the machine body, hopper, bowl plate & channel by using vacuum cleaner in case
of Un coated tablet & In case of coated Tablet/Capsule clean the machine body with lint free cloth.
5.5.3.5 Ensure that there is no remnants of the previous product.
5.5.3.6 Record the activity in the log book.
5.6 Drying
5.6.1 After cleaning of Strip Machine mop it from inner and outer side and its dismantled accessories with lint free cloth.
5.6.2 Ensure the complete dryness of machine and its accessories.
5.6.3 Affix cleaned status label on machine after ensuring complete drying.
5.6.4 Always kept the machine well closed while not in use.
5.1 Training shall be provided to the concerned person.
6.0 References:
In-house
7.0 Attachment
Nil
8.0 Distribution:
8.1 Distribution of the controlled copy of the SOP shall be made by concerned departments.
8.2 Additional copies may be issued for specific purpose.
9.0 Abbreviations:
SOP : Standard Operating Procedure
Pvt. : Private
Ltd. : Limited
QA. : Quality Assurance
BPR : Batch Packing Record
10.0 Revision History
| Revision No. | Supersedes | Effective Date | Details of Reason |
| 01 | Nil | New SOP |
Online Rejection in parenteral
Receipt of Batch from Production to Packing Department
sop for for Spillage Handling in parenteral area
sop for calibration of vessels with dipstick
sop for Cleaning of Bins and Containers
cip of mixing vessel and holding vessel
sop for Cleaning of Ampoule Filling and Sealing Machine
sop for Fogging in Sterile and Non Sterile Area
sop for for Filtration of Bulk Solution
sop for fumigation in production area
sop for post cleaning after media fill
sop for cip of mixing vessel mixing mobile vessel and holding vessel
sop for De-Bagging of Three Piece Vial Dropper Caps
sop for calibration and verification of check weigher
sop for Batch number and Manufacturing and Expiry Date Coding System
standard operating procedure machine history file
sop for operation and cleaning of Hand coder
sop for Cleaning and Handling and Silicone Tubes
sop on operation and cleaning of coating pan
sop for Operation of cleaning of pipe lines
sop for operation of capsule loading machine semi automatic
sop for Machine operation capsule inspection and polishing machine
Sop batch demarcation and batch coding
sop for monitoring of reprocessing of products
sop for in-process control on liquids orals
sop for in process controls on tablets capsules packaging line
sop for Issuance retrieval and destruction of BMR and analytical records
sop for in process controls during granulation compression coating inspection
sop for Cleaning of Blister packing machine
sop for for charge hand over between the shifts
Performance requalification report of visual inspectors
sop for Cleaning and operation of ROPP caps inspection table
sop for usage and destruction of filter pad and cartridge filter
sop for cleaning and storage of transfer pipe
sop for Cleaning and operation of labeling machine
Cleaning and operation of the mono block filling and sealing machine
sop for Cleaning and operation of empty bottle inspection table
sop for Cleaning and operation of filter press
sop for cleaning and operation of liquid transfer pump and line
sop for cleaning and operation of storage vessels
sop for cleaning and operation of sugar syrup manufacturing vessel
sop for cleaning issuance and retrieval of accessories and change parts
sop for Cleaning and operation of visual inspection conveyor belt
sop for Cleaning and operation of spray gun and assemble
sop for Fogging in Aseptic and Non Aseptic Area
Cleaning And Assembly Of Tube Filling Machine
Proper Handling of Non Recoverable Residues
sop for Handling Of Off Line Packing
Air Washing Of Collapsible Tube
Handling Of Dispensed Material
sop for operation and cleaning of paste kettle
sop for operation and cleaning of fluid bed dryer
sop for operation and cleaning of multi mill
sop for operation and cleaning of double rotary compression machine
sop for operation and cleaning of deduster machine
sop for operation and cleaning of coating machine
sop for operation and cleaning of tablet inspection belt
Transfer of packing material from store to packing department
sop for operation and cleaning of strip packing machine
