1.0 Objective
To lay down the procedure for Pest and Rodent Control inside the factory premises
2.0 Scope
This procedure is applicable for Pest and Rodent Control in the plant at abc company.
3.0 Responsibility
3.1 All Supervisor of HR & Administration
3.2 Manager/ Head Concern Area
4.0 Abbreviations and Definitions
SOP : Standard Operating Procedure
HR : Human Resource
CC NO : Change Control Number
cGMP : Current Good Manufacturing Practice
HOD : Head of Department
5.0 Procedure
5.1 Method Of Paste Control
5.1.1 Company has made a contract with an approved external pest control agency to carry out the pest control operation.
5.1.2 Trained pest control personnel (External Agency) shall visit the factory and carry

out the pest control treatment.
5.1.3 The HR/ Personnel department shall monitor pest & Rodent control programme.
5.1.4 Care shall be taken to avoid the exposure of materials during pest control operation and ensure

the operations are carried out only in the non-manufacturing areas.
5.2 Insect Control
5.2.1 Disinfestations treatment for insects shall be carried out on every weekly thoroughly, which involves

spraying insecticide systematically to keep the premises free from any insects.
5.2.2 The concerned department deputed person monitor the satisfactory disinfestations treatment

and initial the Insect Control Record.
5.2.3 Pest control agency shall check for any presence of insects in the manufacturing

areas, packing areas and warehouse and ensure proper treatment as per insect control schedule.
5.3 Fly Control:
5.3.1 Flying insects control is carried out by the in house deputed person from personnel/ security

monitor for the proper treatment. Flying objects control carried out by installation of Insectocutors

and air curtains The Insectocutors installed at the Location as per the Annexure III and keep ON for 24 hours.
5.3.2 The Insectocutors to be cleaned daily in the morning for the cleaning purpose, the following to be followed:
Step 1- Switch ‘OFF’ the mains.
Step 2- Remove the bottom plate of the Insectocutor.
Step 3- Clean the bottom plate with duster & fix it back to the Insectocutor.
Step 4- Switch ‘ON’ the mains
5.4 Rodents Control
5.4.1 Rodent control shall be carried out by placing weather proof blocks / cakes around the factory

premises which includes Administrative Block, Utilities Block, ETP Plants, and Security

office at the gate and along the boundary wall.
5.4.2 The Rodent treatment shall be carried out on a weekly basis. A deputed person from the

Personnel Department ensure the proper treatment and initial the Rodent Control Record as per the schedule as Annexure
5.4.3 The entire pest control operations are periodically reviewed and assessed by Personnel & Administration department.
5.5 Frequency of Pest & Rodent Control Operations

   S. No.

 

Description Frequency
01 General Disinfestations

Service

April – September Once in a week
October – March Once in a week
02 Flies Control Services

 

April – September Once in a week
October – March Once in a week
03 Rodent Management Services April – September Once in a week
October – March Once in a week

5.6 Pest Control contract involves measures for
5.6.1 Spraying of the pesticides for the control of all flying insects (Mosquitoes, Flies), ants and lizards.
5.6.2 Mosquito Control Treatment
5.6.3 Anti Cockroach Treatment
5.6.4 Pest control agency shall procure chemicals used for the Pest Treatment.
5.6.5 Pest Control activities are recorded as per the format given.
5.6.6 Locations for Pest control treatment
5.6.7 Around the Production Unit
5.6.8 Reception and Security Block
5.6.9 Around warehouse
5.6.10 Utility block
5.6.11 Toilets
5.7 Rodent control contract involves measures for
5.7.1 Rodent control treatment shall be carried out for the control of rat’s mice.
5.7.2 Trap shall be always placed adjacent to the walls or on rodent runways.
5.7.3 In case of outside of production block, the person of pest control agency as per their frequency

should keep chemicals at defined location.
5.7.4 House Keeping personnel shall visit the premises as per need to change the feed and monitor

the status of rats traps for presence of rat, mice etc.
5.7.5 If any rats & mice are observed in any of the locations it will be sent for the disposal.
5.7.6 Locations for Rodent control treatment
5.7.7 Warehouse
5.7.8 Change Rooms
5.7.9 Service floor
5.8 Safety Precautions
5.8.1 Avoid direct contact or inhalation of poison by wearing gas mask, rubber gloves, goggles and protective clothing.
5.8.2 In case of any spillage on the body, it should be washed with plenty of water.
5.8.3 Avoid contact with skin.
5.8.4 Call a physician immediately if any symptom of poisoning appears in a person.

Chemical to be used for the pest, insect and rodent control
Sr.No  Aims Chemical Does Frequency Antidote Remark
1.

 

 

 

 

General

Disinfestations

Beta-Cyfluthrin

(2.45%)

+ Diclorvas (76%)

10 ml/liter water

5 ml / liter water

Weekly Atropine

Sulphate 2-4 mg intravenously at 5-10minutes interval for hours together

(Wash contaminated skin and irrigate eyes with normal saline )

2.

 

Spider  Control Deltamathrin (2.8%) 2 ml / liter water Monthly As above
 

3.

 

 

 

 

 

Lizard Control Chlorphriphos

(20%)

1 liter /19 liter water

 

 

Monthly As above The solution is sprayed directly

on the lizard in the evening/night hours (All the lights need to put on)

 

4.

 

 

 

Red & Black Ants Control

 

Methyl parathion dust (2%) As such Weekly As above Dust sprayed outside the factory building and garden
5.

 

 

Rodent control Bromediolone

(0.005 %)

As such Weekly Vitamin -K

6.0 Forms and Records
6.1 Record of Insect Control – Annexure-1
6.2 Cleaning of Insecticutors – Annexure-2
6.3 Record of Rodent Control – Annexure-3
7.0 Distribution
7.1 Master Copy – Documentation Cell (Quality Assurance)
7.2 Controlled Copy – Quality Assurance, Personnel & Administration, Production
8.0 History

Revision Number Details For Change
Reason for Revision
00 New SOP NA

 

Online Rejection in parenteral

Receipt of Batch from Production to Packing Department

sop for for Spillage Handling in parenteral area

sop for calibration of vessels with dipstick

sop for Cleaning of Bins and Containers

cip of mixing vessel and holding vessel

SOP FOR BATCH MANUFACTURING

sop for placebo batch

sop for Cleaning of Ampoule Filling and Sealing Machine

sop for Fogging in Sterile and Non Sterile Area

sop for for Filtration of Bulk Solution

sop for fumigation in production area

sop for post cleaning after media fill

sop for cip of mixing vessel mixing mobile vessel and holding vessel

sop for De-Bagging of Three Piece Vial Dropper Caps

sop for calibration and verification of check weigher

sop for Batch number and Manufacturing and Expiry Date Coding System

sop for Sanitization of Seals

standard operating procedure machine history file

sop for operation and cleaning of Hand coder

sop for Cleaning and Handling and Silicone Tubes

sop on operation and cleaning of coating pan

sop for Operation of cleaning of pipe lines

Sop for equipment assembly

sop for operation of capsule loading machine semi automatic

sop for Machine operation capsule inspection and polishing machine

Sop for issue of material

Sop batch demarcation and batch coding

sop for material receipts

sop for monitoring of reprocessing of products

sop for in-process control on liquids orals

sop for in process controls on tablets capsules packaging line

sop for Issuance retrieval and destruction of BMR and analytical records

sop for in process controls during granulation compression coating inspection

sop for Cleaning of Blister packing machine

sop for for charge hand over between the shifts

Performance requalification report of visual inspectors

sop for Cleaning and operation of ROPP caps inspection table

sop for usage and destruction of filter pad and cartridge filter

sop for cleaning and storage of transfer pipe

sop for Cleaning and operation of labeling machine

Cleaning and operation of the mono block filling and sealing machine

sop for Cleaning and operation of empty bottle inspection table

sop for Cleaning and operation of filter press

sop for cleaning and operation of liquid transfer pump and line

sop for cleaning and operation of storage vessels

sop for cleaning and operation of sugar syrup manufacturing vessel

sop for cleaning issuance and retrieval of accessories and change parts

sop for Cleaning and operation of visual inspection conveyor belt

sop for Cleaning and operation of spray gun and assemble

sop for Fogging in Aseptic and Non Aseptic Area

Cleaning And Assembly Of Tube Filling Machine

Proper Handling of Non Recoverable Residues

sop for Handling Of Off Line Packing

Air Washing Of Collapsible Tube

sop for Pest and Rodent Control

 

 

Leave a Comment

error: Content is protected !!