1.0 OBJECTIVE :

1.1 To lay down a procedure for rectification of audio visual alarms of various systems..

2.0. SCOPE :
2.1 This procedure is applicable to Stability chamber, BOD Incubator, N2, O2 and Granulation/Coating AHU’S situated at Pharma Dekho.

3.0. RESPONSIBILITY :

3.1 Engineering and Maintenance Department.

4.0. ACCOUNTABILITY :
4.1 Head of Engineering Department shall be responsible for compliance of SOP.

5.0. PROCEDURE :

5.1 Audio visual Alarming system for Stability chambers and BOD Incubators



5.1.1 This Audio Visual Alarming system installed for stability chamber BOD Incubator and Hooters at utility Alarm panel board.

5.1.2 Description of audio visual alarms

Sr. No Equipment ID Equipment Name TEMP (ºC) RH %
Set Limit set Limit
1. STABILITY CHAMBER-1 30 28 – 32 75 70 – 80
2. STABILITY CHAMBER-2 40 38 – 42 75 70 – 80

5.1.3 This Audio Visual Alarming system functions when out of limit values observed for temperature/RH (as per 5.1.2) in stability chamber/BOD Incubators.
5.1.4 Add out of limit of Temp./RH in Stability chamber/BOD Incubator, the alarm system gives audio/visual alarms on Panel.
5.1.5 Immediate Operator checks, the signal of Particular stability/BOD Incubator in panel.
5.1.6 Operator acknowledge the alarms of particular system and immediately attend the system.
5.1.7 The Operator shall verify the failures of Stability chamber/BOD Incubator as per below mention check points.
( i) Failure of power supply.
(ii) Failure of Cooling compressor/Fan.
(iii) Failure of heater.
(iv) Failure of steam bath in stability chamber.
(v) Controller for Temp. and RH.
5.1.8 After rectification of failure cause, observe particular system for one hour for proper functioning.
5.1.9 Re-set the alarm switch in alarm panel board after rectification and



fill up annex-I.
5.1.10 Inform to concern dept Head for rectification.
5.2 Audio visual Alarming system for N2 and O2 cylinders
5.2.1 The Audio Visual Alarming system installed for N2 and O2 supply station and Hooter at utility alarm panel board.
5.2.2 When N2 and O2 pressure goes below to 3.5 kg/cm², than the alarm shall be generated .
5.2.3 Replaced empty cylinder with filled cylinder.
5.3 Audio visual Alarming system for Temp. of Coating and Granulation AHU’S
5.3.1 The Audio Visual Alarming system installed for hot water storage tank for Coating and Granulation AHU’S at utility.
5.3.2 Audio visual alarming panel installed at utility alarm panel board.
5.3.3 When the temp. of hot water goes below to 60ºC then alarm shall be generated.
5.3.4 Check the heater of hot water, verify it and record.
5.3.5 If temperature not achieved within 10 minutes operator shall inform the engg. And concern dept. head.



6.0. ABBREVIATION :

Sr. No. Abbreviation used Full form of abbreviation used
1. SOP Standard operating procedure
2. EM Engineering and maintenance

7.0 ATTACHMENTS (ANNEXES) :
Annex-I : LOG SHEET FOR STABILITY AND BOD INCUBATOR ALARM SYSTEM
Annex-II : LOG SHEET FOR N2/O2 ALARM SYSTEM

8.0. REFERENCE :

 

Annex-I : LOG SHEET FOR STABILITY AND BOD INCUBATOR ALARM SYSTEM

Annex-II : LOG SHEET FOR N2/O2 ALARM SYSTEM

Online Rejection in parenteral

Receipt of Batch from Production to Packing Department

sop for for Spillage Handling in parenteral area

sop for calibration of vessels with dipstick

sop for Cleaning of Bins and Containers

cip of mixing vessel and holding vessel

SOP FOR BATCH MANUFACTURING

sop for placebo batch

sop for Cleaning of Ampoule Filling and Sealing Machine

sop for Fogging in Sterile and Non Sterile Area

sop for for Filtration of Bulk Solution

sop for fumigation in production area

sop for post cleaning after media fill

sop for cip of mixing vessel mixing mobile vessel and holding vessel

sop for De-Bagging of Three Piece Vial Dropper Caps

sop for calibration and verification of check weigher

sop for Batch number and Manufacturing and Expiry Date Coding System

sop for Sanitization of Seals

standard operating procedure machine history file

sop for operation and cleaning of Hand coder

sop for Cleaning and Handling and Silicone Tubes

sop on operation and cleaning of coating pan

sop for Operation of cleaning of pipe lines

Sop for equipment assembly

sop for operation of capsule loading machine semi automatic

sop for Machine operation capsule inspection and polishing machine

Sop for issue of material

Sop batch demarcation and batch coding

sop for material receipts

sop for monitoring of reprocessing of products

sop for in-process control on liquids orals

sop for in process controls on tablets capsules packaging line

sop for Issuance retrieval and destruction of BMR and analytical records

sop for in process controls during granulation compression coating inspection

sop for Cleaning of Blister packing machine

sop for for charge hand over between the shifts

Performance requalification report of visual inspectors

sop for Cleaning and operation of ROPP caps inspection table

sop for usage and destruction of filter pad and cartridge filter

sop for cleaning and storage of transfer pipe

sop for Cleaning and operation of labeling machine

Cleaning and operation of the mono block filling and sealing machine

sop for Cleaning and operation of empty bottle inspection table

sop for Cleaning and operation of filter press

sop for cleaning and operation of liquid transfer pump and line

sop for cleaning and operation of storage vessels




sop for cleaning and operation of sugar syrup manufacturing vessel

sop for cleaning issuance and retrieval of accessories and change parts

sop for Cleaning and operation of visual inspection conveyor belt

sop for Cleaning and operation of spray gun and assemble

sop for Cleaning of Air Handling Unit Ducting

sop for Uninterrupted Power Supply UPS

sop for Operation of Chiller and Pumps

sop for Preventive Maintenance of Equipments and Machineries

sop for cleaning of Dosing tank

sop for Audio Visual Alarms of various systems

 

 

Leave a Comment

error: Content is protected !!