sop for Operation of Nitrogen Plant

 

sop for Operation of Nitrogen Plant

 

1.0 OBJECTIVE :

1.1 To lay down a procedure for operation of nitrogen gas plant.

2.0. SCOPE :

2.1 This procedure is applicable to Nitrogen gas plant situated at pharma Dekho

3.0. RESPONSIBILITY :

3.1 Operator Engineering Department shall be responsible for operation of nitrogen gas plant and maintained the record.
3.2 Officer/Executive Engineering Department shall be responsible for to verify the operation of nitrogen gas plant.



4.0. ACCOUNTABILITY :

4.1 Head Engineering Department shall be accountable for compliance of SOP.

5.0. PROCEDURE :

5.1 OPERATION OF NITROGEN GAS PLANT START UP .
5.1.1 The area near the unit should be kept clean.

5.1.2 Check that the Control panel is getting power supply.

5.1.3 Ensure that drain valves of all equipments are closed.

5.1.4 Switch ‘ON’ the main switch & control supply switch and accept `hooter’, open water line valve and ensure that the water pressure is about 2.0 Kg/cm2.

5.1.5 Ensure that the PSA module is working and also check for the pressurize and depressurization of towers taking place as per the pressure and time curve.

5.1.6 Check that minimum pressure in the adsorbing towers of PSA goes to 6.2 Kg/cm2 and to maintain that , control the air flow by the globe valve V9 provided just at the air inlet into the PSA module.

5.1.7 Discharge the gas for 5-10 minutes, through the middle discharge valve. Adjust the Nitrogen Rota meter for the designed flow.

5.1.8 As soon as the Oxygen percentage at Surge Tank reaches within limits, close the Middle discharge Valve by the push button provided on the panel.

5.1.9 Copper Catalyst System will get automatically ‘ON’ through timer.

5.1.10 Before switching on Cracked Ammonia Supply, the whole unit should be purged with Nitrogen to ensure that no air is present in the unit.



5.1.11 Check that all pressure switches, and TIC’s are set as per the instructions given in the manual

5.1.12 Check the oxygen content in the product gas. If it is with in limits, press the push button to close the final vent valve and flow of gas to storage vessel starts.

5.2 NORMAL SHUT DOWN

5.2.1 Switch off control supply switch and main switch. Don’t disturb the setting of Needle Valves. Stop H2 supply.

5.3 PRECAUTION TAKEN WHILE RUNNING PANT:-

5.3.1 Check auto drain traps provided with, all Coolers and Air receivers are working and there is no water carry over. To ensure this manual drain valves should be opened to drain out the moisture, if any for after every 3-4 hours.

5.3.2 Check and ensure that all valves of PSA module are opening/ closing properly and min. pressure in both adsorbers goes to 6.0 kg/cm.2 and time sequence is O.K.

5.3.3 Check and ensure the changeover of towers and working of valves are according to the time cycle.



5.3.4 Back pressure controller function should be observed and checked periodically so that it always maintains 5.0-5.5 kg/cm2 in the Cu-Cat System.

5.3.5 Enter the operation details in the equipment log as per Annexure-I

5.3.6 Record the details in the monitoring record(Annexure II) in a frequency of every two hours

6.0. ABBREVIATION :

Sr. No. Abbreviation used Full form of abbreviation used
1. ADU Air Dryer Unit
2. PSA Pressure Swing Observation
3 CU-DE-OXO Copper DE-OXO Unit
4 TIC Temperature Indicator Controller
5 A/C Activated Carbon Filter
6 PPM Part Per Million
7 TI Temperature Indicator
8 PI Pressure Indicator

7.0 ATTACHMENTS (ANNEXES) :

Annex I : Operation Log Sheet of Nitrogen Plant
Annex II : Nitrogen Plant Monitoring Record.

8.0. REFERENCE :

In House

 

Annex I : Operation Log Sheet of Nitrogen Plant

 

Annex II : Nitrogen Plant Monitoring Record.

 

Online Rejection in parenteral

Receipt of Batch from Production to Packing Department

sop for for Spillage Handling in parenteral area

sop for calibration of vessels with dipstick

sop for Cleaning of Bins and Containers

cip of mixing vessel and holding vessel

SOP FOR BATCH MANUFACTURING

sop for placebo batch

sop for Cleaning of Ampoule Filling and Sealing Machine

sop for Fogging in Sterile and Non Sterile Area

sop for for Filtration of Bulk Solution

sop for fumigation in production area

sop for post cleaning after media fill

sop for cip of mixing vessel mixing mobile vessel and holding vessel

sop for De-Bagging of Three Piece Vial Dropper Caps

sop for calibration and verification of check weigher

sop for Batch number and Manufacturing and Expiry Date Coding System

sop for Sanitization of Seals

standard operating procedure machine history file

sop for operation and cleaning of Hand coder

sop for Cleaning and Handling and Silicone Tubes

sop on operation and cleaning of coating pan

sop for Operation of cleaning of pipe lines

Sop for equipment assembly

sop for operation of capsule loading machine semi automatic

sop for Machine operation capsule inspection and polishing machine

Sop for issue of material

Sop batch demarcation and batch coding

sop for material receipts

sop for monitoring of reprocessing of products

sop for in-process control on liquids orals

sop for in process controls on tablets capsules packaging line

sop for Issuance retrieval and destruction of BMR and analytical records

sop for in process controls during granulation compression coating inspection

sop for Cleaning of Blister packing machine

sop for for charge hand over between the shifts

Performance requalification report of visual inspectors

sop for Cleaning and operation of ROPP caps inspection table

sop for usage and destruction of filter pad and cartridge filter

sop for cleaning and storage of transfer pipe

sop for Cleaning and operation of labeling machine

Cleaning and operation of the mono block filling and sealing machine

sop for Cleaning and operation of empty bottle inspection table

sop for Cleaning and operation of filter press

sop for cleaning and operation of liquid transfer pump and line

sop for cleaning and operation of storage vessels




sop for cleaning and operation of sugar syrup manufacturing vessel

sop for cleaning issuance and retrieval of accessories and change parts

sop for Cleaning and operation of visual inspection conveyor belt

sop for Cleaning and operation of spray gun and assemble

sop for Cleaning of Air Handling Unit Ducting

sop for Operation of Nitrogen Plant

Leave a Comment

error: Content is protected !!