sop for Validation master Plan

 

sop for Validation master Plan

1.0 OBJECTIVE:
To lay down Standard Operating Procedure for “Validation master Plan”.
2.0 SCOPE:
This procedure is applicable for preparation, review, approval and authorization of Validation Master Plan
3.0 RESPONSIBILITY:
QA (Officer/ Executive): shall be responsible Preparation, Distribution, Revision, Retrieval and
Destruction of this SOP.
Head QC: shall be responsible for review of VMP.
Head Engineering: Shall be responsible for review of VMP.
QA (Executive /Manager): shall be responsible for review of VMP.
Head Quality Assurance: shall be responsible for approval of the VMP.
4.0 ACCOUNTABILITY:
Head-Quality Assurance shall be accountable for ensuring compliance of this Standard Operating
Procedure.
5.0 DEFINITION:
Validation Master Plan is defined as an overview of the entire validation operation, its organizational structure, its content

and planning. The core of VMP shall consist of the list of the items to be validated and the planning schedule
6.0 PROCEDURE:
6.1 Validation program is designed to demonstrate that the facility for the production and storage of Active Pharmaceutical

Ingredient and its intermediate is capable of meeting process parameters in a repeatable and controllable manner.
6.2 Facility is designed to provide the necessary and required degree of environment and manufacturing control for all

production steps throughout the manufacturing process. Critical utilities, processes and equipment validation

program are established in accordance with the method and procedures mandated by the product requirements

which are based on the currently available product information and the current Good Manufacturing

Practices, guidelines and other regulations.
6.3 All system is subject to ongoing validation to evaluate the impact of change in process, systems,

computers (software), environment, intentionally or un-intentionally
6.4 Validation studies as detailed in the protocol are carried out by nominated team comprising personnel
From various disciplines.
6.5 Qualification
User requirement Specification: For any of the critical equipment user department shall mention specification,

which specifies the technical specification of the equipment or system, regulatory specification, safety

specification, documentary specification, engineering specification. Details specified in the URS shall be

mention in the protocol.
Design Qualification:
Demonstrates that the proposed design of the facility, equipment, control system, utility and selected components

is suitable for intended purpose.



Installation Qualification:
Demonstrates that the facility, equipment, control system, utility and selected components are the ones installed

as per the approved design, that they are at the specified locations, that they are properly identified, that the

required SOP’s exists, that operating manuals are on file and that all the critical measuring devices are

calibrated using an established calibration program me.
Operational Qualification:
Demonstrates that all facility, equipment, control system, utilities and the components of each of the systems

perform as intended throughout the anticipated operating ranges.
Performance Qualification:
Demonstrates by the execution of a series of tests that the facility, equipment, control system and utility used in

the manufacturing process perform in a reproducible manner and meet the pre-established specifications.
The performance qualification will also include testing that demonstrates that all intermediate and final product

specifications can be met. This phase will be executed once the process parameters have been defined.
6.6 Process Validation:
Prospective Validation:
The Prospective validation should take care of the following:
Development report, Responsibilities, Process description, Equipment details, Equipment Qualification, Equipment

Calibration, Batch record, Validation protocols for specific activities, Quality Control release specification, Sampling plan,

Comparison of yields, Process parameters and Quality parameters, evaluating results and responsibilities.
Concurrent validation:
This is the Validation carried out during routine production. This validation comprises of identification and

evaluation of process (including critical process parameters) and quality parameters applicable for the product.

This should be performed on 3 consecutive batches. At least one batch should be monitored on long term stability.
Retrospective validation:
Retrospective validation is historical trending of results of testing and in-process parameters evaluation on

established products to demonstrate that:
Critical quality attributes and critical process parameters are still valid and comply to the acceptance criteria.

Process and in-process controls are appropriate for the given product.
Process Revalidation: The major change in process will require for revalidation of the critical parameters to show

that it does not affect product quality. The process will be revalidated in case there is known changes.

For example: formula, critical equipment, critical process parameters, batch size, site and change in vendor for API.

The critical parameters identified in the prospective or concurrent validation will be monitored during revalidation.

The number of the batches to be studied will depend on the nature of change for which study is planned.

In case there is no change in process, re-validation shall be carried out once in 6 years.
6.7 Cleaning Validation:
This should be performed to provide documented evidence that the procedure being followed for cleaning of

equipment and accessories is effective and removes residues of previous batch / product up to a predetermined

acceptance level, using a well-defined protocol and acceptance criteria.
There are one method employed for sampling during cleaning validation. That is swab/rinse method.
Cleaning procedures for products and processes, which are similar, do not need to be individually validated.
A representative of similar range can be selected to justify a validation programme, which addresses the critical

issues relating to selected products and processes.



A single validation study under consideration of the ‘Worst case’ can be carried out which takes into account

the relevant criteria.

Presently we are doing Cleaning verification for product by swab/rinse method. Incoming year

we will perform cleaning in a systematic way.
6.8 Revalidation:
Revalidation is done to evaluate the impact of changes in process, product, systems, computers (software),

environment, intentionally or un-intentionally.
The re-validation process is intended to ensure that validated systems continue to perform in accordance with

the parameters defined during the original validation.
All systems subject to validation should be revalidated within a pre-specified period of time.

The re-validation frequency will be determined upon completion of the initial validation of a system.
6.9 Revalidation after change is done in the following circumstances:
Major changes in processing steps Eg.: Critical process parameters, input materials, batch size.
Major change in equipment size, design, construction and its material of fabrication.
Major change in area and support system.
Major change in Quality Control Analytical Methods.
Major change in Computer – Software and Hardware.
6.10 Water System Validation:
Water system includes pretreatment of source water, generation of purified water, and distribution of purified water.
DQ, IQ and OQ of the water generation system shall be done in accordance with user requirement

and as specified in the equipment qualification.
After qualification of generation system performance qualification of water system shall be done.
Performance Qualification of water system shall be divided in three parts named as Phase-I, phase-
II and phase-III.
6.11 HVAC System Validation
Validation protocol shall be prepared for the yearly validation. Separate summary report for each AHU shall

be made by QA with the help of engineering and production.
All the operations parameters of AHU shall be qualified in operational qualification of AHU. HVAC system

shall be revalidated once in a year. Details shall be mention in the respective protocol.
6.12 HVAC Re- qualification: Re-qualification of facility shall be carried out only when there is major
Modification or changes introduced. In HVAC, apart from the parameters monitored routinely like
Temperature, RH, pressure differential and microbial monitoring, other parameters shall be verified
Once in year. Review of routine parameters and compilation of other parameters shall constitute re-
Qualification.
6.13 Pure Steam Validation: Quality attributes of pure steam generator should essentially meet the
Requirements of specification of pure steam generator. The quality of pure steam generation
Requires WFI, hence the specification of pure steam condensate shall meet the specifications of
WFI.
6.14 Compressed Air Validation:
Compressed air system is designed to supply oil free (non lubricated) compressed air to the various points.
The compress air system is made up of control with self-diagnostic facility.



6.15 Sterilizer Cum Bung Processor Validation:
Sterilizer cum bung processor is used for washing of rubber bungs and for sterilization of article.
6.16 Sterilizing and Depyrogenating tunnel: It is used for sterilization and dehydrogenation of glass
Containers (Vials and ampoules).
6.17 Nitrogen: Nitrogen generation system is made up of self diagnostic property and and nitrogen is used in different processes during manufacturing of products.
6.18 Analytical Method Validation:
All the Non- Pharmacopoeia analytical methods used in analysis at different stages of product shall be validation

as per recommendations of ICH. Typical validation characteristics which should be considered area listed below:
Accuracy
Precision
Specificity
Detection limit
Quantitation Limit
Linearity
Range
6.19 Risk Assessment: consists of the identification of hazards and the analysis and evaluation of
Risks associated with exposure to those hazards (as defined below). Quality risk assessments begin with a

well-defined problem description or risk question. When the risk in question is well defined, an appropriate

risk management tool and the types of information needed to address the risk question will be more readily identifiable.

As an aid to clearly defining the risk(s) for risk assessment purposes, three fundamental questions are often helpful:
What might go wrong?
What is the likelihood (probability) it will go wrong?
What are the consequences (severity)?
6.20 Calibration/Verification Policy:
Calibration is done in two ways i.e. In-house calibration of instruments which can be performed at site

and calibration done by external agency.
Calibration of few instruments for which written procedure is available at the site are calibrated by

qualified personnel at site by predefined written procedure.
Agreement is done with external agency for the instruments and gauges which cannot be calibrated at the site.
Master calibration plan is prepared and all internal and external calibrations are performed as per the master calibration plan.
For some instruments there is policy of verification against the certified standards.
Traceability for all standards shall be available at the site.
All certified standards are recertified by government agency after span of time as per the scheduled.
Certified standards shall only be used within date of certification.
6.21 Vendor Qualification:
Vendor qualification shall be carried out for all vendors of critical raw and packing materials, to ensure that

the components of the product ,consistently meet predetermined specifications. has an established standard

operating procedure for vendor qualification.

6.22 Preventive Maintenance:
Preventive maintenance of all equipment’s and instruments is taken care as per preventive maintenance schedule.
Preventive maintenance schedule for all equipment’s and instruments is prepared and is approved by QA.
Preventive maintenance is performed as per the approved schedule.
Preventive maintenance can be done in-house or by outside party as per the requirement.
6.23 Protocol Preparation & Execution:
Members of the validation team shall be responsible for preparation of validation protocol, specifically QA,

along with user department shall prepare the protocol.
Prepared protocol shall be reviewed by validation team and then the finally by the heads of the involved department.
Validation protocol shall be finally approved by Head Quality Assurance.
Execution of the validation activity as per the protocol shall be done by the user department with the help of involved department.
All the work related to engineering operations shall be carried out by engineering department.
All the analytical work involved in the validation shall be carried out by quality control
Department.
The activities related to issuance and dispensing of the material shall be taken care by Warehouse
Progress of validation activity and the compliance shall be monitored by validation Team.
Final report of validation activity shall be prepared by QA with the help of user Department.
6.24 Annexure-I for Validation Master Plan preparation.
6.25 The Header part of VMP shall contains following details:
6.25.1 Company Logo, Validation Master plan, Company Name, Document No., superseded no. and
Page No.
6.26 Validation Master Plan shall contain the following content:
6.26.1 Approval Page
6.26.2 Introduction of the Document
6.26.3 Purpose
6.26.4 Scope
6.26.5 Responsibilities
6.26.6 Definition
6.26.7 Validation Master plan
6.26.8 Facility Description
6.26.9 Validation Policy
6.26.10 Revalidation Policy
6.26.11 Equipment Qualification
6.26.12 Facility Qualification
6.26.13 Process Validation Plan
6.26.14 Cleaning Validation Plan
6.26.15 Water System Qualification
6.26.16 HVAC System Validation
6.26.17 Steam Generator
6.26.18 Compressed Air Validation
6.26.19 Sterilization Cum Bung Validation
6.26.20 Sterilization and Depyrogenating Tunnel
6.26.21 Nitrogen Validation
6.26.22 Analytical Method Validation
6.26.23 Performance Qualification Plan of Utilities
6.26.24 Risk Assessment
6.26.25 Calibration Verification Policy
6.26.26 Vendor Qualification
6.26.27 Preventive Maintenance Policy
6.26.28 Document Control System
7.0 ABBREVIATIONS:
QA Corporate Quality Assurance
EHS Environment, Health & Safety
NA Not Applicable
No. Number
PDF Portable Document Format
QA Quality Assurance
QC Quality Control
Sign Signature
SOP Standard Operating Procedure
VMP Validation Master Plan

8.0 ANNEXURES:

ANNEXURE NO. TITLE OF ANNEXURE FORMAT NO.
Annexure– I
 Validation Master Plan preparation
Annexure – II Weighing Balance Calibration Planner
Annexure – III Instrument  Calibration  Planner
Annexure – IV
 Equipment Validation Planner
Annexure – V AHU Validation Planner

9.0 DESTRIBUTOION DETAILS
Master Copy Quality Assurance Department
Controlled Copy No. 01 Quality Assurance Department.
Controlled Copy No. 02 Quality Control Department.
Controlled Copy No. 03 Production Department.
Controlled Copy No. 04 Formulation and Development.
Controlled Copy No. 05 Engineering Department.
Controlled Copy No. 06 Warehouse Department (Store)
10.0 REFERENCE:
In-House, PIC/S VMP guidelines, WHO  on good manufacturing practices: validation.
As per SOP title good documentation practice and SOP No.

11.0 REVISION HISTORY:

Revision No. Change Control No. Details of Changes Reason of Changes Effective Date Done By
00 Not Applicable Not Applicable New SOP  

 

preparation for sampling Intimation slip

Online Rejection in parenteral

Receipt of Batch from Production to Packing Department

sop for for Spillage Handling in parenteral area

sop for calibration of vessels with dipstick

sop for Cleaning of Bins and Containers

cip of mixing vessel and holding vessel

SOP FOR BATCH MANUFACTURING

sop for placebo batch

sop for Cleaning of Ampoule Filling and Sealing Machine

sop for Fogging in Sterile and Non Sterile Area

sop for for Filtration of Bulk Solution

sop for fumigation in production area

sop for post cleaning after media fill

sop for cip of mixing vessel mixing mobile vessel and holding vessel

sop for De-Bagging of Three Piece Vial Dropper Caps

sop for calibration and verification of check weigher

sop for Batch number and Manufacturing and Expiry Date Coding System

sop for Sanitization of Seals

standard operating procedure machine history file

sop for operation and cleaning of Hand coder

sop for Cleaning and Handling and Silicone Tubes

sop on operation and cleaning of coating pan

sop for Operation of cleaning of pipe lines

Sop for equipment assembly

sop for operation of capsule loading machine semi automatic

sop for Machine operation capsule inspection and polishing machine

Sop for issue of material

Sop batch demarcation and batch coding

sop for material receipts

sop for monitoring of reprocessing of products

sop for in-process control on liquids orals

sop for in process controls on tablets capsules packaging line

sop for Issuance retrieval and destruction of BMR and analytical records

sop for in process controls during granulation compression coating inspection

sop for Cleaning of Blister packing machine

sop for for charge hand over between the shifts

Performance requalification report of visual inspectors

sop for Cleaning and operation of ROPP caps inspection table

sop for usage and destruction of filter pad and cartridge filter

sop for cleaning and storage of transfer pipe

sop for Cleaning and operation of labeling machine

Cleaning and operation of the mono block filling and sealing machine

sop for Cleaning and operation of empty bottle inspection table

sop for Cleaning and operation of filter press

sop for cleaning and operation of liquid transfer pump and line

sop for cleaning and operation of storage vessels

sop for cleaning and operation of sugar syrup manufacturing vessel

sop for cleaning issuance and retrieval of accessories and change parts

sop for Cleaning and operation of visual inspection conveyor belt

sop for Cleaning and operation of spray gun and assemble

sop for Fogging in Aseptic and Non Aseptic Area

Preparation of Site Master File

sop for Validation master Plan

Leave a Comment

error: Content is protected !!