Descaling of Multi Effect Distillation System and Pure Steam Generator

 

Descaling of Multi Effect Distillation System and Pure Steam Generator

 

1.0 OBJECTIVE :

1.1 To lay down a procedure for Descaling of Multi Effect Distillation System and Pure Steam Generator .

2.0. SCOPE :

2.1 This procedure is applicable to Multi Effect Distillation System and Pure Steam Generator situated at Pharma Dekho.

3.0. RESPONSIBILITY :

3.1 Operator Engineering Department shall be responsible for Descaling of Multi Effect Distillation System and Pure Steam Generator and maintaining the record.
3.2 Officer/Executive Engineering Department shall be responsible for to verify the proper Descaling of Multi Effect Distillation System and Pure Steam Generator and to take corrective action if any operational deviation.

4.0. ACCOUNTABILITY :

4.1 Head Engineering Department shall be responsible for compliance of SOP.

5.0. PROCEDURE :



5.1 DE SCALING OF COLUMN
5.1.1. Before starting the process switch ‘OFF’ the main control panel of the MEDS and PSG.
5.1.2. Connect the feed water pump suction with the out let of the last column to chemical preparation Stainless Steel (SS) tank..
5.1.3. Add 6 kg sodium hydroxide flakes and 200 liter purified water in chemical tank. Mix the solution properly.
5.1.4. Re-circulate the solution through the columns for 2 hrs by switch ON the feed water pump.



5.1.5. After 2 hours switch ‘Off’ the pump. Drain the solution and flush the column with purified water for neutralizing the system. (Check the pH, it should be7-8).
5.1.6. After neutralization of column, add 30 kg citric acid and 200 liter purified water in chemical tank and mixes the solution properly.
5.1.7. Re-circulate the solution through the columns for 1hr by switch ‘On’ the feed water pump.
5.1.8. After one hour, mix 9 kg Ammonic Bifloride into the citric acid solution and continue the re circulation for another 2 hours.
5.1.9. After the 2 hour re circulation, mix 60 liters of Ammonia solution (commercial grade) and 1 liter Teepol into the citric acid Ammonic Bifloride solution. Continue the re circulation for 2 hours.



5.1.10. After 2 hours re circulation mix 1.5 kg of Sodium Nitrite into the above solution and re circulate for another one hour.
5.1.11. Switch ‘Off’ the feed pumps and drain the solution from the columns.
5.1.12. Flush the columns with purified water for 5-6 hours.
5.1.13. After flushing the columns, check the pH and conductivity. It should be same as feed water. Otherwise continue the flushing till achieved the pH and conductivity.
5.1.14. Reconnect the feed pump suction line and outlet line of the last column.



5.2. DESCALING OF TOP COOLER (CONDENSOR):
5.2.1 Connect the cooling water pump suction and out let of the top cooler to chemical preparation SS tank.
5.2.2 Add5 kg sulphamic acid (commercial grade) and 200-liter warm purified water in chemical tank. Mix the solution properly.
5.2.3 Circulate the solution through the top cooler for 2 hrs by switch ON the cooling water pump.
5.2.4 After 2 hours switch ‘Off’ the pump. Drain the solution and flush the top cooler with purified water for 4-5 hours.
5.2.5 After flushing check the pH and conductivity of the water. It should be same as feed purified water. Otherwise continue the flushing till achieved pH and conductivity.
5.2.6 Reconnect the feed pump suction line and outlet line of the top cooler.
5.2.7 Operate the plant as per SOP No.:
5.2.8 Record the De scaling of MEDS and PSG plant as per Annex –I.
5.2.9 De scaling of the Multi Effect Distillation System and Pure Steam Generator shall be carried out once a year.



6.0. ABBREVIATION :

Sr. No. Abbreviation used Full form of abbreviation used
1. SOP Standard operating procedure
2. EM Engineering and maintenance
3 MEDS Multi Effect Distillation System
4 PSG Pure Steam Generator

ATTACHMENTS (ANNEXES)         :

 

Annex-I  :  De scaling record of MEDS and PSG plant.

 

8.0.      REFERENCE :

In House 

Annex-I  :  De scaling record of MEDS and PSG plant

 

sop for Execution of Preventive Maintenance

Preparation of Sodium Hydroxide Solution

sop for Breakdown Maintenance

sop for Handling of Filters

sop for water cooled chiller operation

cleaning and preventive maintenance of LAF and RLAF

sop for replacement of water system filters

cleaning and preventive maintenance of insectocutor

sop for operation of preventive maintenance

sop for material receiving and consumption record

sop for Preventive maintenance of bottle washing machine

sop for Replacement of Battery of Electronic Devices

sop for Preparation of R.O. Antiscalant Solution

Preventive Maintenance of Rapid Cooling Steam Sterilizer

Preventive Maintenance of Rapid cooling steam Generator

sop for Preventive Maintenance of Dust Collector

sop for Replacement of HVAC filters

SOP for Battery Backup in Mobile Laminar Air Flow Trolley

sop for Replacement of Tube lights

sop for Replacement of UV light of purified water plant

sop for Cleaning of soft water storage tank and RO feed tank

sop for Preparation of Sodium hydroxide Solution

sop for Operation and regeneration of softener plant

Procedure Of Issuance Of material from Engineering Store

sop for Preventive Maintenance of Filter Press

sop for Preventive Maintenance of Sugar Transfer System

sop for Preventive Maintenance of Shrink Sleeve Machine

sop for Preventive Maintenance of ROPP Cap Elevator

sop for Preventive Maintenance of Liquid Transfer Pumps

sop for Preventive Maintenance of Liquid Tanks

Preventive Maintenance of Strip De-Foiling Machine

sop for Preventive Maintenance of Colloidal Mill

sop for Preventive Maintenance of Packing Collator Belt

sop for Checking light intensity

sop for Operation of Fire- Extinguisher

sop for Passivation of WFI Distribution Loop

sop for Analysis of Effluent Treatment Plant Water

sop for Methodology to Dispose ETP Sludge

sop for Action Plan In Case Of Electrical Power Failure

sop for Colour Coding of Piping and Accessories of Utilities

sop for Replacement Policy

sop for Disposal of Engineering Waste

Filter Cleaning of HVAC System RLAF & LAF

Procedure for Calibration of Magnehelic Gauge

Procedure for Calibration of Vacuum Gauge

Procedure for Calibration of Pressure Gauge

sop for Procedure for Calibration of Temperature Controller

sop for Area Validation

sop for Preventive Maintenance of Infrared Dryer Umbrella Type

sop for Preventive Maintenance of Battery stacker

sop for Preventive Maintenance of Lift

sop for Preventive Maintenance of Vacuum Cleaner

sop for Preventive Maintenance of laminar air flow unit

sop for Preventive Maintenance of Lozenges Manufacturing Line

sop for Preventive Maintenance of Garment Washing Machine

sop for Preventive Maintenance of Multi Column Distillation Plant

sop for Preventive Maintenance of Steam Sterilizer Autoclave

sop for Preventive Maintenance of Pure steam Generator

sop for Preventive maintenance of Depyrogenating Tunnel

sop for Preventive Maintenance of vial sealing machine

sop for preventive maintenance of Powder Filling and Rubber Stoppering machine

sop for Preventive Maintenance of Vial Washing Machine

sop for Preventive Maintenance of Inspection Table

sop for Preventive Maintenance of Hi-Cart

sop for Preventive Maintenance of Turn table

sop for Preventive Maintenance of sticker labeling machine

sop for Preventive Maintenance of Liquid Filling and Sealing Machine

sop for Preventive Maintenance of Linear Bottle Washing Machine

sop for Preventive Maintenance of De-Foiling Machine




sop for Preventive Maintenance of Strip Packing Machine

sop for Preventive Maintenance of Blister Packing Machine

sop for Preventive Maintenance of Capsule Polishing and Sorting Machine

sop for Preventive Maintenance of Capsule Filling Machine 

sop for Preventive maintenance of Auto Coater

sop for Preventive Maintenance of Compression Machine

sop for preventive maintenance of packing conveyor belt

sop for Preventive Maintenance of Sifter Cum Multi mill

sop for Preventive Maintenance of Rapid Mixer Granulator

sop for Preventive Maintenance Of Fluid Bed Dryer

sop for Preventive Maintenance of Octagonal Blender

sop for Preventive Maintenance of Lifting and Positioning Device

sop for Preventive Maintenance of Paste Preparation vessel

sop for preventive maintenance of Vibro-Sifter

sop for preventive maintenance of air curtain

sop for preventive maintenance of air handling units

Preventive Maintenance of Diesel Generator

sop for Preventive Maintenance of cooling towers

sop for Preventive Maintenance of Boiler

sop for Preventive Maintenance of Air Compressor

sop for Preventive Maintenance of Chilling Plant

sop for Preventive Maintenance of Transformers

sop for Preventive maintenance of Purified Water System

sop for Break Down maintenance of Machine and Work Requisition

Leave a Comment

error: Content is protected !!