sop for Preventive Maintenance of Lozenges Manufacturing Line
1.0 Objective
To lay down a procedure for the Preventive Maintenance of Lozenges Manufacturing Line.
2.0 Scope
This Standard Operating Procedure is applicable for Preventive Maintenance of Lozenges Manufacturing Line to be followed at formulation plants
3.0 Responsibility
3.1 Officer / Executive Engineering shall be responsible for the execution of this procedure.
3.2 Engineering Manager shall be responsible for the compliance of this SOP.
3.3 Head QA/designee shall be responsible for the compliance of this SOP.
4.0 Abbreviations and Definitions
SOP : Standard Operating Procedure
No : Number
QA : Quality Assurance
Qty : Quantity
ER : Engineering
5.0 Procedure
5.1 General conditions:
5.1.1 Refer the master plan of Preventive Maintenance.
5.1.2 Equipment shall be available for Preventive Maintenance.
5.1.3 Clean oil / grease stains & remove unwanted material, spares after completion of work.
5.2 Precautions:
5.2.1 Use necessary safety wears, while doing the work.
5.2.2 Ensure covers & guards are properly fixed.
5.3 Procedure for preventive maintenance of lozenges manufacturing line:
5.3.1 Ensure that electrical supply is in off position in main panel and display “Under Maintenance” Board on the panel board.
5.3.2 Switch OFF the drive unit and inform all the concerned.
5.3.3 Operator or above has to ensure and verify the check points for the Preventive Maintenance as shown in the Annexure 1,2 &3 of this SOP.
5.3.4 After the completion of preventive maintenance, check the machine for smooth operation.
5.3.5 Remove “Under Maintenance” Board on the panel board after completion of the maintenance.
5.3.6 The operator / technician who perform the job will enter his name / sign in “Done By” column and responsible Engineer/ Officer will put sign in “Checked by” column Department Head will review the record every month.
5.3.7 Half yearly maintenance will include the jobs of Quarterly Maintenance and Yearly maintenance will include the jobs of Quarterly, and Half Yearly Maintenance.
5.3.8 Quarterly Preventive Maintenance is to be carried out as per the following check points:
5.3.8.1 Clean the steam trap of tempering belt.
5.3.8.2 Check the Pure steam condensate is drained continuously.
5.3.8.3 Check the oil level in FRC Unit.
5.3.8.4 Check the all electrical terminal connections and tighten the same.
5.3.8.5 Check the Leakage of Thermograv, Cooker and Holding tank
5.3.8.6 Check and tight the motor foundation bolts.
5.3.8.7 Check lubricates all the transmission chain in drive section with grease.
5.3.9 Half Yearly Preventive Maintenance is to be carried out as per the following check points:
5.3.9.1 Check the safety valve setting and working of safety valves.
5.3.9.2 Check the proper earthing.
5.3.9.3 Check all the bearings of motor, if required replace/ lubricate with grease.
5.3.9.4 Lubricate all wall/ pivot mounted bearing with silicon grease.
5.3.9.5 Clean the panel and check the tightness of the terminals.
5.3.9.6 Lubricate all the gear box gears.
5.3.9.7 Overhaul vibrator assembly.
5.3.9.8 Grease the Chains.
5.3.9.9 Check the air pressure setting on Air pressure Regulator.
5.3.9.10 Check the set value for all parameters of machine.
5.3.9.11 Check the Machine Leaks.
5.3.9.12 Overhaul Rope sizer assembly.
5.3.10 Yearly Preventive Maintenance is to be carried out as per the following check points:
5.3.10.1 Check the condenser tubes for scale deposition. Check for proper water flow at pressure gauges.
5.3.10.2 Overhaul Batch Roller assembly.
5.3.10.3 Overhaul Batch forming machine assembly
5.3.10.4 Overhaul cooling Tunnel assembly .
5.3.10.5 Check all electrical connections (control panel, all motors,) for any connections, burned contacts, signs of overheated wires.
6.0 Forms and Records
6.1 Quarterly PM Check List of Lozenges Manufacturing Line – Annexure
6.2 Half Yearly PM Check List of Lozenges Manufacturing Line – Annexure
6.3 Yearly PM Check List of Lozenges Manufacturing Line – Annexure
7.0 Distribution
7.1 Master copy – Documentation Cell (Quality Assurance)
7.2 Controlled copies – Engineering Department
sop for Execution of Preventive Maintenance
Preparation of Sodium Hydroxide Solution
sop for water cooled chiller operation
cleaning and preventive maintenance of LAF and RLAF
sop for replacement of water system filters
cleaning and preventive maintenance of insectocutor
sop for operation of preventive maintenance
sop for material receiving and consumption record
sop for Preventive maintenance of bottle washing machine
sop for Replacement of Battery of Electronic Devices
sop for Preparation of R.O. Antiscalant Solution
Preventive Maintenance of Rapid Cooling Steam Sterilizer
Preventive Maintenance of Rapid cooling steam Generator
sop for Preventive Maintenance of Dust Collector
sop for Replacement of HVAC filters
SOP for Battery Backup in Mobile Laminar Air Flow Trolley
sop for Replacement of Tube lights
sop for Replacement of UV light of purified water plant
sop for Cleaning of soft water storage tank and RO feed tank
sop for Preparation of Sodium hydroxide Solution
sop for Operation and regeneration of softener plant
Procedure Of Issuance Of material from Engineering Store
sop for Preventive Maintenance of Filter Press
sop for Preventive Maintenance of Sugar Transfer System
sop for Preventive Maintenance of Shrink Sleeve Machine
sop for Preventive Maintenance of ROPP Cap Elevator
sop for Preventive Maintenance of Liquid Transfer Pumps
sop for Preventive Maintenance of Liquid Tanks
Preventive Maintenance of Strip De-Foiling Machine
sop for Preventive Maintenance of Colloidal Mill
sop for Preventive Maintenance of Packing Collator Belt
sop for Checking light intensity
sop for Operation of Fire- Extinguisher
sop for Passivation of WFI Distribution Loop
sop for Analysis of Effluent Treatment Plant Water
sop for Methodology to Dispose ETP Sludge
sop for Action Plan In Case Of Electrical Power Failure
sop for Colour Coding of Piping and Accessories of Utilities
sop for Disposal of Engineering Waste
Filter Cleaning of HVAC System RLAF & LAF
Procedure for Calibration of Magnehelic Gauge
Procedure for Calibration of Vacuum Gauge
Procedure for Calibration of Pressure Gauge
sop for Procedure for Calibration of Temperature Controller
sop for Preventive Maintenance of Infrared Dryer Umbrella Type
sop for Preventive Maintenance of Battery stacker
sop for Preventive Maintenance of Lift
sop for Preventive Maintenance of Vacuum Cleaner
sop for Preventive Maintenance of laminar air flow unit
sop for Preventive Maintenance of Lozenges Manufacturing Line
sop for Preventive Maintenance of Garment Washing Machine
sop for Preventive Maintenance of Multi Column Distillation Plant
sop for Preventive Maintenance of Steam Sterilizer Autoclave
sop for Preventive Maintenance of Pure steam Generator
sop for Preventive maintenance of Depyrogenating Tunnel
sop for Preventive Maintenance of vial sealing machine
sop for preventive maintenance of Powder Filling and Rubber Stoppering machine
sop for Preventive Maintenance of Vial Washing Machine
sop for Preventive Maintenance of Inspection Table
sop for Preventive Maintenance of Hi-Cart
sop for Preventive Maintenance of Turn table
sop for Preventive Maintenance of sticker labeling machine
sop for Preventive Maintenance of Liquid Filling and Sealing Machine
sop for Preventive Maintenance of Linear Bottle Washing Machine
sop for Preventive Maintenance of De-Foiling Machine
sop for Preventive Maintenance of Strip Packing Machine
sop for Preventive Maintenance of Blister Packing Machine
sop for Preventive Maintenance of Capsule Polishing and Sorting Machine
sop for Preventive Maintenance of Capsule Filling Machine
sop for Preventive maintenance of Auto Coater
sop for Preventive Maintenance of Compression Machine
sop for preventive maintenance of packing conveyor belt
sop for Preventive Maintenance of Sifter Cum Multi mill
sop for Preventive Maintenance of Rapid Mixer Granulator
sop for Preventive Maintenance Of Fluid Bed Dryer
sop for Preventive Maintenance of Octagonal Blender
sop for Preventive Maintenance of Lifting and Positioning Device
sop for Preventive Maintenance of Paste Preparation vessel
sop for preventive maintenance of Vibro-Sifter
sop for preventive maintenance of air curtain
sop for preventive maintenance of air handling units
Preventive Maintenance of Diesel Generator
sop for Preventive Maintenance of cooling towers
sop for Preventive Maintenance of Boiler
sop for Preventive Maintenance of Air Compressor
sop for Preventive Maintenance of Chilling Plant
sop for Preventive Maintenance of Transformers
sop for Preventive maintenance of Purified Water System
sop for Break Down maintenance of Machine and Work Requisition
sop for Operation of Dust Extraction System
sop for Operation Of Effluent Treatment Plant
sop for Operation Of Diesel Generator
sop for Operation of Multi Column Distillation Plant
sop for Operation of Pure Steam Generator
sop for Operation of Air Handling Unit
sop for Operation of Cooling Tower
sop for Operation of Air Compressor
sop for Operation of Water Chilling Plant
sop for Cleaning of Pure Steam Generator
Cleaning of Over Head Water Tanks HDPE
sop for Cleaning of Water tanks
sop for Sanitization of multi column plant
sop for Sanitization of Ultrafiltration System
Sop for Chemical Sanitization of Reverse Osmosis
Sop for Sanitization of Hot Sanitization & Electro Deionization unit
sop for Sanitization of Purified Water Loop
sop for preparation of sodium meta bisulphate solution
sop for Testing of Hardness of Soft Water
sop for Operation & back wash of multi grade filter
sop for testing of chlorine contents in water