sop for Operation of Air Handling Unit
1.0 Objective
To lay down a procedure for the operation of AHU system, Ventilation& Exhaust System.
2.0 Scope
This Standard Operating Procedure is applicable for the operation of all Air Handling Unit (Make Contec Air Flow) to be followed at formulation plants
3.0 Responsibility
3.1 Engineering Officer / Executive shall be responsible for the execution of this procedure.
3.2 Engineering Manager shall be responsible for the implementation of this SOP.
3.3 Head QA/designee shall be responsible for the compliance of this SOP.
4.0 Abbreviations and Definitions
SOP : Standard Operating Procedure
No : Number
QA : Quality assurance
Qty : Quantity
AHU : Air handling unit
CHW : Chilled water
ER : Engineering
VFD : Variable Frequency Drive
5.0 Procedure.
5.1 Check for availability of power supply in all AHU main panel and individual AHU Panel.
5.2 Check that the doors are completely closed to avoid any leakage of air.
5.3 Check that the fresh air damper.
5.4 Check that the CHW (chilled water) inlet and CHW outlet.
5.5 Ensure that 3-way valve in return circuit of chilled water is adequately opened and by-pass valve is closed. By pass valve is operated in case only when 3-way valve is taken for preventive maintenance/breakdown maintenance.
5.6 Check that the chiller plant is continuously operated for provision of chilled water to the AHU at not more than 20ºC.
5.7 Check that the pressure gauges and temperature gauges are properly mounted.
5.8 After ensuring all above points. Switch on the AHU from the AHU panel.
5.9 Check Magnehalic gauge readings for pressure difference across pre filter (4 to 8 mm WC) and fine filters (8 to 12 mm WC) and note down the reading in log book.
5.10 Check Magnehalic gauge readings for pressure difference across HEPA filter (25 to 50 mm WC) and note down the reading in log book.
5.11 If readings are below limit replace filter and if it is above limit clean the filter.
5.12 Before shutdown of the AHU ensure the pressure difference across pre filter (4 to 8 mm WC) and fine filters (8 to 12 mm WC) are maintained and record the same in AHU operation log.
5.13 If the area is under cleaning temperature, RH & differential pressure shall not be recorded at the time. Production in charge will ensure that the required environment condition are maintained before the start of production which shall be recorded in the BMR, in case of any deviation he will inform engineering department immediately for corrective action.
5.14 At the start of shift / day, AHU of all Corridors shall be started first. Afterwards other AHUs shall be started. In case of power failure and after its restoration through DG power ensure that AHUs of all passage / corridor starts in auto mode first. This is to prevent cross contamination. All other AHU’S are then started one by one in manual mode of operation. Production in-charge will ensure that the required environmental parameters are achieved before re-commencement of production activity. In dry powder injection, all AHUs will start in auto mode. HVAC operator will log the stop and start status of AHU’s in Annexure-1
5.15 In case AHU fails to start after power restoration due to any reason/fault, HVAC operator will immediately informed Engineering Manager who will confirm precautionary measures to production department. After rectification of fault, HVAC engineer will inform the production charge so that the production activities can be re-started again.
6.0 Forms and Records
6.1 Air Handling Unit Operation Records. – Annexure-1
7.0 Distribution
7.1 Master copy – Documentation Cell (Quality Assurance)
7.2 Controlled copies – Engineering Department
Annexure-1
sop for Execution of Preventive Maintenance
Preparation of Sodium Hydroxide Solution
sop for water cooled chiller operation
cleaning and preventive maintenance of LAF and RLAF
sop for replacement of water system filters
cleaning and preventive maintenance of insectocutor
sop for operation of preventive maintenance
sop for material receiving and consumption record
sop for Preventive maintenance of bottle washing machine
sop for Replacement of Battery of Electronic Devices
sop for Preparation of R.O. Antiscalant Solution
Preventive Maintenance of Rapid Cooling Steam Sterilizer
Preventive Maintenance of Rapid cooling steam Generator
sop for Preventive Maintenance of Dust Collector
sop for Replacement of HVAC filters
SOP for Battery Backup in Mobile Laminar Air Flow Trolley
sop for Replacement of Tube lights
sop for Replacement of UV light of purified water plant
sop for Cleaning of soft water storage tank and RO feed tank
sop for Preparation of Sodium hydroxide Solution
sop for Operation and regeneration of softener plant
Procedure Of Issuance Of material from Engineering Store
sop for Preventive Maintenance of Filter Press
sop for Preventive Maintenance of Sugar Transfer System
sop for Preventive Maintenance of Shrink Sleeve Machine
sop for Preventive Maintenance of ROPP Cap Elevator
sop for Preventive Maintenance of Liquid Transfer Pumps
sop for Preventive Maintenance of Liquid Tanks
Preventive Maintenance of Strip De-Foiling Machine
sop for Preventive Maintenance of Colloidal Mill
sop for Preventive Maintenance of Packing Collator Belt
sop for Checking light intensity
sop for Operation of Fire- Extinguisher
sop for Passivation of WFI Distribution Loop
sop for Analysis of Effluent Treatment Plant Water
sop for Methodology to Dispose ETP Sludge
sop for Action Plan In Case Of Electrical Power Failure
sop for Colour Coding of Piping and Accessories of Utilities
sop for Disposal of Engineering Waste
Filter Cleaning of HVAC System RLAF & LAF
Procedure for Calibration of Magnehelic Gauge
Procedure for Calibration of Vacuum Gauge
Procedure for Calibration of Pressure Gauge
sop for Procedure for Calibration of Temperature Controller
sop for Preventive Maintenance of Infrared Dryer Umbrella Type
sop for Preventive Maintenance of Battery stacker
sop for Preventive Maintenance of Lift
sop for Preventive Maintenance of Vacuum Cleaner
sop for Preventive Maintenance of laminar air flow unit
sop for Preventive Maintenance of Lozenges Manufacturing Line
sop for Preventive Maintenance of Garment Washing Machine
sop for Preventive Maintenance of Multi Column Distillation Plant
sop for Preventive Maintenance of Steam Sterilizer Autoclave
sop for Preventive Maintenance of Pure steam Generator
sop for Preventive maintenance of Depyrogenating Tunnel
sop for Preventive Maintenance of vial sealing machine
sop for preventive maintenance of Powder Filling and Rubber Stoppering machine
sop for Preventive Maintenance of Vial Washing Machine
sop for Preventive Maintenance of Inspection Table
sop for Preventive Maintenance of Hi-Cart
sop for Preventive Maintenance of Turn table
sop for Preventive Maintenance of sticker labeling machine
sop for Preventive Maintenance of Liquid Filling and Sealing Machine
sop for Preventive Maintenance of Linear Bottle Washing Machine
sop for Preventive Maintenance of De-Foiling Machine
sop for Preventive Maintenance of Strip Packing Machine
sop for Preventive Maintenance of Blister Packing Machine
sop for Preventive Maintenance of Capsule Polishing and Sorting Machine
sop for Preventive Maintenance of Capsule Filling Machine
sop for Preventive maintenance of Auto Coater
sop for Preventive Maintenance of Compression Machine
sop for preventive maintenance of packing conveyor belt
sop for Preventive Maintenance of Sifter Cum Multi mill
sop for Preventive Maintenance of Rapid Mixer Granulator
sop for Preventive Maintenance Of Fluid Bed Dryer
sop for Preventive Maintenance of Octagonal Blender
sop for Preventive Maintenance of Lifting and Positioning Device
sop for Preventive Maintenance of Paste Preparation vessel
sop for preventive maintenance of Vibro-Sifter
sop for preventive maintenance of air curtain
sop for preventive maintenance of air handling units
Preventive Maintenance of Diesel Generator
sop for Preventive Maintenance of cooling towers
sop for Preventive Maintenance of Boiler
sop for Preventive Maintenance of Air Compressor
sop for Preventive Maintenance of Chilling Plant
sop for Preventive Maintenance of Transformers
sop for Preventive maintenance of Purified Water System
sop for Break Down maintenance of Machine and Work Requisition
sop for Operation of Dust Extraction System
sop for Operation Of Effluent Treatment Plant
sop for Operation Of Diesel Generator
sop for Operation of Multi Column Distillation Plant
sop for Operation of Pure Steam Generator
sop for Operation of Air Handling Unit
sop for Operation of Cooling Tower
sop for Operation of Air Compressor
sop for Operation of Water Chilling Plant
sop for Cleaning of Pure Steam Generator
Cleaning of Over Head Water Tanks HDPE
sop for Cleaning of Water tanks
sop for Sanitization of multi column plant
sop for Sanitization of Ultrafiltration System
Sop for Chemical Sanitization of Reverse Osmosis
Sop for Sanitization of Hot Sanitization & Electro Deionization unit
sop for Sanitization of Purified Water Loop
sop for preparation of sodium meta bisulphate solution
sop for Testing of Hardness of Soft Water