sop for Operation of Multi Column Distillation Plant

sop for Operation of Multi Column Distillation Plant

 

1.0 Objective 
To lay down a procedure for Operation Multi Column Distillation Plant.
2.0 Scope
This Standard Operating Procedure is applicable for Multi Column Plant Distillation Plant.
3.0 Responsibility
3.1 Engineering Officer / Executive shall be responsible for the execution of this procedure.
3.2 Engineering Manager shall be responsible for the implementation of this SOP.
3.3 Head QA/designee shall be responsible for compliance of this SOP.
4.0 Abbreviations and Definitions


SOP : Standard Operating Procedure
i.e. : That is
No : Number
w.r.t : With respect to
HOD : Head of Department
PLC : Programmable logic controller
WFI : Water for injection
DPI : Dry powder injection



5.0 Procedure
5.1 Pre-Start Up
5.1.1 Ensure the following parameters are programmed as below
• Pre-heating Time = 060 sec
• Purging disorder 1 = 300 sec
• Purging hold = 25 sec
• Purging disorder 2 = 600 sec
• Venting hold = 15 sec
• Venting off time = 300 sec
• Hooter enable = 060 sec
• Initial dumping = 060 sec
5.1.2 Ensure the incoming boiler steam pressure is in the range of 3 to 5 kg/cm².
5.1.3 Ensure the compressed air pressure in the range of 3 to 6 kg/cm².
5.1.4 Ensure the purified water pressure in the range of gauge 4 to 7 kg/cm²
5.2 Starting Procedure
5.2.1 Auto Mode
5.2.2 Open the steam valve and remove the condensate from line.
5.2.3 Open the air regulator valve of compressed air to achieve the required pressure.
5.2.4 Open the purified water valve to achieve the required pressure
5.2.5 Switch ON the main switch from panel to ON position in AUTO Mode
5.2.6 The process gets started one by one in auto mode till the WFI gets start to produce and will be continued till any parameter goes out of range.
5.2.7 If any parameter goes out of range hooter will start than press the ACK button from PLC and rectify the displayed observation.
5.2.8 Record the details in provided format and get it cross checked by officer production OR concerned Engineer/Officer.
5.3 Manual Operation
5.3.1 Open the steam valve and remove the condensate from line.
5.3.2 Open the air regulator valve of compressed air to achieve the required pressure.
5.3.3 Open the purified water valve to achieve the required pressure.
5.3.4 Switch ON the main switch from panel to ON position in Manual Mode.
5.3.5 Switch ON the venting valve followed by purging valve and than dumping valve.
5.3.6 Switch ON cooling pump ON.
5.3.7 Switch ON feed pump ON.
5.3.8 Observe the indicators provided on Machine Panel.
5.3.9 Record the observations in provided formats.
5.3.10 Observe the on-line conductivity limits are for purified water <5 µs/cm and for water for injection <1 µs/cm.
6.0 Forms and Records
6.1 Multi Column Distillation Plant Operation Record – Annexure-1

7.0 Distribution
7.1 Master copy – Documentation Cell (Quality Assurance)
7.2 Controlled copies – Engineering Department

 sop for Execution of Preventive Maintenance

Preparation of Sodium Hydroxide Solution

sop for Breakdown Maintenance

sop for Handling of Filters

sop for water cooled chiller operation

cleaning and preventive maintenance of LAF and RLAF

sop for replacement of water system filters

cleaning and preventive maintenance of insectocutor

sop for operation of preventive maintenance

sop for material receiving and consumption record

sop for Preventive maintenance of bottle washing machine

sop for Replacement of Battery of Electronic Devices

sop for Preparation of R.O. Antiscalant Solution

Preventive Maintenance of Rapid Cooling Steam Sterilizer

Preventive Maintenance of Rapid cooling steam Generator

sop for Preventive Maintenance of Dust Collector

sop for Replacement of HVAC filters

SOP for Battery Backup in Mobile Laminar Air Flow Trolley

sop for Replacement of Tube lights

sop for Replacement of UV light of purified water plant

sop for Cleaning of soft water storage tank and RO feed tank

sop for Preparation of Sodium hydroxide Solution

sop for Operation and regeneration of softener plant

Procedure Of Issuance Of material from Engineering Store

sop for Preventive Maintenance of Filter Press

sop for Preventive Maintenance of Sugar Transfer System

sop for Preventive Maintenance of Shrink Sleeve Machine

sop for Preventive Maintenance of ROPP Cap Elevator

sop for Preventive Maintenance of Liquid Transfer Pumps

sop for Preventive Maintenance of Liquid Tanks

Preventive Maintenance of Strip De-Foiling Machine

sop for Preventive Maintenance of Colloidal Mill

sop for Preventive Maintenance of Packing Collator Belt

sop for Checking light intensity

sop for Operation of Fire- Extinguisher

sop for Passivation of WFI Distribution Loop

sop for Analysis of Effluent Treatment Plant Water

sop for Methodology to Dispose ETP Sludge

sop for Action Plan In Case Of Electrical Power Failure

sop for Colour Coding of Piping and Accessories of Utilities

sop for Replacement Policy

sop for Disposal of Engineering Waste

Filter Cleaning of HVAC System RLAF & LAF

Procedure for Calibration of Magnehelic Gauge

Procedure for Calibration of Vacuum Gauge

Procedure for Calibration of Pressure Gauge

sop for Procedure for Calibration of Temperature Controller

sop for Area Validation

sop for Preventive Maintenance of Infrared Dryer Umbrella Type

sop for Preventive Maintenance of Battery stacker

sop for Preventive Maintenance of Lift

sop for Preventive Maintenance of Vacuum Cleaner

sop for Preventive Maintenance of laminar air flow unit

sop for Preventive Maintenance of Lozenges Manufacturing Line

sop for Preventive Maintenance of Garment Washing Machine

sop for Preventive Maintenance of Multi Column Distillation Plant

sop for Preventive Maintenance of Steam Sterilizer Autoclave

sop for Preventive Maintenance of Pure steam Generator

sop for Preventive maintenance of Depyrogenating Tunnel

sop for Preventive Maintenance of vial sealing machine

sop for preventive maintenance of Powder Filling and Rubber Stoppering machine

sop for Preventive Maintenance of Vial Washing Machine

sop for Preventive Maintenance of Inspection Table

sop for Preventive Maintenance of Hi-Cart

sop for Preventive Maintenance of Turn table

sop for Preventive Maintenance of sticker labeling machine

sop for Preventive Maintenance of Liquid Filling and Sealing Machine

sop for Preventive Maintenance of Linear Bottle Washing Machine

sop for Preventive Maintenance of De-Foiling Machine

sop for Preventive Maintenance of Strip Packing Machine

sop for Preventive Maintenance of Blister Packing Machine

sop for Preventive Maintenance of Capsule Polishing and Sorting Machine

sop for Preventive Maintenance of Capsule Filling Machine 

sop for Preventive maintenance of Auto Coater

sop for Preventive Maintenance of Compression Machine

sop for preventive maintenance of packing conveyor belt

sop for Preventive Maintenance of Sifter Cum Multi mill

sop for Preventive Maintenance of Rapid Mixer Granulator

sop for Preventive Maintenance Of Fluid Bed Dryer

sop for Preventive Maintenance of Octagonal Blender

sop for Preventive Maintenance of Lifting and Positioning Device

sop for Preventive Maintenance of Paste Preparation vessel

sop for preventive maintenance of Vibro-Sifter

sop for preventive maintenance of air curtain

sop for preventive maintenance of air handling units

Preventive Maintenance of Diesel Generator

sop for Preventive Maintenance of cooling towers

sop for Preventive Maintenance of Boiler

sop for Preventive Maintenance of Air Compressor

sop for Preventive Maintenance of Chilling Plant

sop for Preventive Maintenance of Transformers

sop for Preventive maintenance of Purified Water System

sop for Break Down maintenance of Machine and Work Requisition

sop for Building Maintenance

sop for Operation of Lift

sop for Operation of Dust Extraction System

sop for Operation Of Effluent Treatment Plant

sop for Operation Of Diesel Generator

sop for Operation of Multi Column Distillation Plant

sop for Operation of Pure Steam Generator

sop for Operation of Air Handling Unit

sop for Operation of Cooling Tower

sop for Operation of Air Compressor

sop for Operation of Water Chilling Plant

sop for Operation of Boiler

sop for Cleaning of Pure Steam Generator

Cleaning of Over Head Water Tanks HDPE

sop for Cleaning of Water tanks

sop for Sanitization of multi column plant

sop for Sanitization of Ultrafiltration System

Sop for Chemical Sanitization of Reverse Osmosis

Sop for Sanitization of Hot Sanitization & Electro Deionization unit

sop for Sanitization of Purified Water Loop

sop for preparation of sodium meta bisulphate solution

sop for Testing of Hardness of Soft Water

sop for Operation & back wash of multi grade filter

sop for testing of chlorine contents in water

Leave a Comment

error: Content is protected !!